Large-height-difference advanced mining stopping process
A technology of height difference and craftsmanship, applied in mining equipment, ground mining, mining equipment, etc., can solve the problems of safety, affecting safety production, unreasonable overlap of scraper conveyor heads, etc., to ensure continuity, avoid The effect of workload
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment 1
[0039] This embodiment is described in detail by taking a fully mechanized caving face as an example. The coal seam structure of the fully mechanized caving face is complex, and a fine sandstone with a thickness of 0.03m is developed at a distance of 2.8m to 3.0m from the roof. The average coal thickness is 8.76m, the coal seams at the northwest and southeast corners of the working face are thinner, the middle coal seams are thicker, and the Platinum hardness is f=2-3. During the advancing process of the fully mechanized caving face, determine the position of the production stop line 100: determine the position of the stop production line 100 according to the maximum recovery of coal resources or the angle of the adjacent coal mining face, such as figure 1 As shown, the angle between the production stop line 100 and the horizontal plane is 16°.
[0040] Specifically, the height difference between the rail alignment and the transportation alignment is 30m, the rail alignment is...
specific Embodiment 2
[0068] This embodiment is the same as the specific embodiment 1 in that the same working surface is taken as an example for illustration.
[0069] Specifically, such as Figure 1-4 As shown, the head of the coal shearer is advanced to the front of the stop production line 100, and the coal mining face is stopped by means of rotary stop and segmented online. Determine the location of stop production line 100: determine the location of stop production line 100 according to the maximum recovery of coal resources or the angle of the adjacent coal mining face, such as figure 1 As shown, the angle between the production stop line 100 and the horizontal plane is 16°.
[0070] Specifically, the height difference between the rail alignment and the Yunshun is 30m, the rail alignment is 60m ahead of the Yunshun when the mining is stopped, and the net slope length of the working face is 213m when the mining is stopped, an increase of 3.8m.
[0071] Furthermore, the specific process of r...