A well and its construction method
A technology of wells and decks, applied in buildings, building components, vertical pipes, etc., can solve the problems of difficulty in ensuring the coincidence and verticality of the upper and lower sections of the well, high technical requirements for workers, and high construction difficulty, so as to facilitate construction and construction , low technical requirements, and the effect of reducing noise and light pollution
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0048] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. All other embodiments obtained by persons of ordinary skill in the art based on the embodiments of the present invention belong to the protection scope of the present invention.
[0049] According to an embodiment of the present invention, a hoistway is provided.
[0050] Such as Figure 1-12 As shown, the hoistway includes a base 1, a connecting frame 2, a traction machine fixing plate 3 and a top plate 4, and the four corners of the base 1 are fixed with a mounting plate 6 by a fourth bolt 5, and the mounting plate 6 A first card seat 7 is fixed on the top, and a long rod 8 is plugged into the first card seat 7. The upper and lower ends of the four corners of the co...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


