Stacking, taking and dust removing method for engineering excavation materials
A technology of engineering and stockpile, applied in the direction of program control, comprehensive factory control, comprehensive factory control, etc., can solve the problems of unsuitable engineering excavation material stockpiling and material retrieval management, so as to facilitate resource allocation and prevent stacking chaos , the effect of improving the utilization rate
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0042] The technical solution of the present invention is further described below, but the scope of protection is not limited to the description.
[0043] like figure 1 Shown, a kind of engineering excavation stockpiling method of the present invention comprises the following steps:
[0044] Step 1. Divide the engineering excavation materials into useful materials and useless materials, and specify the types of useful materials and useless materials;
[0045] Step 2. Divide the storage yard into useful material storage yards and useless material storage yards as a whole, and divide the useful material storage yards into multiple useful material storage areas according to the types of useful materials and useless materials. Divide the waste material stockpile into multiple waste material landfill areas, and number each landfill area;
[0046] Step 3. Complete the construction of the digital control system;
[0047] Step 4, the vehicle enters the site, and unloads the loaded ...