Building construction quality monitoring method, system and device and storage medium

A quality monitoring and building construction technology, applied in the field of devices and storage media, systems, and building construction quality monitoring methods, can solve construction quality problems, uncertainties, affecting the final quality of buildings, etc., so as to facilitate search and improve construction quality. Effect

Pending Publication Date: 2021-02-19
杭州绿锦建筑设计咨询有限公司
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] However, during the construction process, due to the limitations of the construction, most of the equipment is controlled by humans, which leads to the uncertainty of the constructio

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Building construction quality monitoring method, system and device and storage medium
  • Building construction quality monitoring method, system and device and storage medium
  • Building construction quality monitoring method, system and device and storage medium

Examples

Experimental program
Comparison scheme
Effect test

Example Embodiment

[0065]Example one:

[0066]A construction quality monitoring method, referencefigure 1 ,include:

[0067]101. Obtain construction drawings, perform BIM modeling on the target building according to the construction drawings, and generate construction animations.

[0068]Specifically, construction animation is a 4D simulation, combined with BIM modeling technology to generate process animation. Among them, the construction plan includes the construction plan and the CAD plan drawing of the target building when obtaining the construction drawings. The plan contains a complete construction plan. The construction plan includes at least several construction steps, and the construction time of each construction step is planned, that is, the construction schedule plan.

[0069]First, build a three-dimensional model of the target building structure using Autodesk Revit software based on the CAD plan of the target building. Among them, the three-dimensional model of the building structure includes the bu...

Example Embodiment

[0114]Example 2:

[0115]Construction quality monitoring system, referencefigure 2 ,include:

[0116]Generating Apparatus 201, acquires construction drawings, perform BIM modeling according to the construction drawings, and generates construction animation.

[0117]The partitioning device 202 divides the construction animation into several parts segments, each of which corresponds to a construction step.

[0118]The monitoring device 203 monitors the construction process of the target building in real time to generate construction video.

[0119]Modeling device 204, according to the construction video 3D modeling, generating construction model.

[0120]The comparison device 205 matches the construction model to the segment corresponding to the construction animation and comparison.

[0121]Further, whenever a construction step is completed, the construction model at this time is labeled;

[0122]The scaled construction model is compared with the fragment corresponding to the construction animation.

[0123]Fu...

Example Embodiment

[0134]Example 3:

[0135]Building construction quality monitoring device, referenceimage 3 ,include:

[0136]The generating device 301 acquires the construction drawing, and the target building is used to generate construction animation according to the construction drawing.

[0137]The division device 302 divides the construction animation into several parts segments, each of which corresponds to a construction step.

[0138]The monitoring device 303 monitors the construction of the target building in real time, and generates a construction video.

[0139]Modeling device 304, according to the construction video 3D modeling, generating a construction model.

[0140]The comparison device 305 matches the construction model to the segment corresponding to the construction animation and comparison.

[0141]Further, whenever a construction step is completed, the construction model at this time is labeled;

[0142]The scaled construction model is compared with the fragment corresponding to the construction anima...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a building construction quality monitoring method, system and device and a storage medium. The method comprises the steps: acquiring a construction drawing, carrying out BIM modeling on a target building according to the construction drawing, and generating a construction animation; dividing the construction animation into a plurality of segments, wherein each segment correspondingly completes one construction step; monitoring the construction process of the target building in real time, and generating a construction video; performing 3D modeling on the target buildingaccording to the construction video to generate a construction model; matching the construction model with a fragment corresponding to the construction animation and comparing the construction modelwith the fragment; and if the comparison result is inconsistent, judging that the quality of the corresponding construction steps is unqualified. Through comparison of the actual construction model and the prediction model, the quality of each construction step can be monitored in the actual construction process, and the effect of improving the construction quality is achieved.

Description

technical field [0001] The present application relates to the field of construction quality, in particular to a method, system, device and storage medium for monitoring construction quality. Background technique [0002] With the vigorous development of large-scale construction projects in our country, engineering construction presents the characteristics of diversified investment subjects, complex technical processes, new building materials, independent enterprises and large-scale construction projects. For a large-scale construction project, quality safety is an important basis to ensure the smooth progress of construction and safe use. Once a quality accident occurs, it will affect the smooth progress of the construction at least, and leave hidden dangers in the project or shorten the service life of the building, or even cause Buildings collapsed, causing casualties and huge economic losses. Therefore, quality and safety issues and risk management in building constructi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06T17/10G06T13/20G06Q10/06G06Q50/08
CPCG06Q10/06393G06Q50/08G06T13/20G06T17/10
Inventor 陈周一郎程成孙振夏
Owner 杭州绿锦建筑设计咨询有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products