[0021] A method for baking a new furnace of an intermediate frequency furnace, the steps comprising:
[0022] (1) Raise a low fire in the furnace to slowly boil the pot of water, and the steam generated can be discharged to the air valve or the raised safety valve.
[0023] (2) Adjust the combustion and air valve opening to keep the boiler at 25% pressure (6-12h in the case of 5%-10% evaporation). time.
[0024] (3) Weaken the combustion, reduce the pressure in the pot to 0.1MPa, let the regular blowdown valves blow down one by one, and add water or add the unfinished solution.
[0025] (4) Strengthen the combustion again, raise the pressure in the pot to 50% pressure, and maintain 5%-10% evaporation for 6-20h.
[0026] (5) Then weaken the combustion to reduce the pressure, discharge the sewage one by one for the regular sewage valves again, and supplement the water supply.
[0027] (6) Raise the pressure in the pot to 75% pressure, and maintain 5%-10% evaporation for 6-20h...
Embodiment 2
[0031] 1. Oven layout:
[0032] 1) There is one slag cooler on the left and right of the bottom of the furnace, which is used for the flue gas to start from the bottom and to bake the materials in this part. 2> Four units are arranged in the furnace area, considering the large volume of the furnace and the thicker bottom materials.
[0033] 3) There are two return legs, and the oven is installed at nine meters away from the furnace.
[0034] 4) There are two feeders, which are arranged on the platform behind the feeder furnace and connected through the manhole door.
[0035] 5) Two cyclone separators are arranged at the inlet and outlet positions, which are directly connected through the manhole door.
[0036] 6) The sequence of putting into the oven:
[0037] 1. Put two slag cooler ovens into operation with a small amount of oil, and gradually increase the oil amount after the combustion is stable, so that the temperature of the slag cooler rises to 150°C to keep warm and ...