Desulfurized reclaimed rubber recycled asphalt mixture and preparation method thereof
A technology for reclaiming asphalt and mixing materials, applied in the field of road engineering materials, can solve the problems of high viscosity and hardness of harmful gas aging asphalt, endangering the health of construction workers, and difficulty in swelling of rubber powder, so as to ensure physical health and reduce maintenance and construction. Cost, fast swelling effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] The desulfurized reclaimed rubber regenerated asphalt mixture is prepared through the following steps:
[0031] Preheat 35 parts of old asphalt pavement reclaimed material in an oven to 195°C±5°C for 5 hours, preheat 2.925 parts of base asphalt to 150°C±5°C for 5 hours in an oven, and preheat 56.1 parts of new aggregate in an oven. Heat to 195°C±5°C and keep it warm for 5 hours; put the reclaimed old asphalt pavement and base asphalt into the mixer after preheating and heat preservation, mix at 180°C for 90s, and then put the new aggregate heated to 180-200°C Add it into the mixer, mix at 180°C for 90s, keep it at 180°C-200°C in the mixer to desulfurize 0.975 parts of rubber powder and 5 parts of component solubilizer, and mix for 180s to prepare the desulfurized For reclaimed rubber and recycled asphalt mixture, the desulfurized rubber powder + matrix asphalt accounts for 25% of the desulfurized rubber powder, and the oil-stone ratio of the desulfurized rubber powder +...
Embodiment 2
[0039] For the preparation of desulfurized reclaimed rubber-reclaimed asphalt mixture, compared with Example 1, the adjustments are as follows: the amount of base asphalt is 2.7 parts, the amount of desulfurized rubber powder is 0.9 parts, the amount of new aggregate is 56.4 parts, and the amount of desulfurized rubber powder + base asphalt and Xinji The asphalt ratio of the raw material is 6.0%.
Embodiment 3
[0041] For the preparation of desulfurized reclaimed rubber reclaimed asphalt mixture, compared with Example 1, the adjustments made are: the amount of base asphalt is 3.15 parts, the amount of desulfurized rubber powder is 1.05 parts, the amount of new aggregate is 55.8 parts, and the amount of desulfurized rubber powder + base asphalt and Xinji The asphalt ratio of the raw material is 7.0%.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com