A brittle time window measurement method and elastic control system for an assembly line
An elastic control system and assembly production line technology, applied in general control systems, control/regulation systems, manufacturing computing systems, etc., can solve the problems of lack of mathematical quantification of production line brittleness and lack of production line brittleness evaluation.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0076] Embodiments of the present invention are described in detail below, examples of which are shown in the drawings, wherein the same or similar reference numerals designate the same or similar elements or elements having the same or similar functions throughout. The embodiments described below by referring to the figures are exemplary only for explaining the present invention and should not be construed as limiting the present invention.
[0077] refer to figure 1 As shown, a method for measuring the brittle time window of an assembly line, the assembly line is a series production line in which N (N ≥ 1) machines and N-1 buffer zones are alternately arranged, and the method includes the following steps:
[0078] Step 1: Virtual and real synchronization between the physical workshop and the virtual workshop;
[0079] Step 2: Before the assembly line starts to work, initialize the parameters of the state of the assembly line in the elastic control system, and calculate the ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


