Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Two-stage power distribution network post-disaster first-aid repair scheduling and load recovery collaborative optimization method and system

A load recovery and collaborative optimization technology, applied in information technology support systems, data processing applications, forecasting, etc., can solve problems such as computational efficiency cannot be guaranteed, and achieve the effects of reducing computational complexity, ensuring timeliness, and minimizing recovery

Active Publication Date: 2021-06-01
STATE GRID ELECTRIC POWER RES INST +1
View PDF2 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The computational efficiency of directly solving this problem cannot be guaranteed. Therefore, it is necessary to partition the fault point according to the geographical distance between the site and the fault point to improve the computational efficiency before the repair work begins.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Two-stage power distribution network post-disaster first-aid repair scheduling and load recovery collaborative optimization method and system
  • Two-stage power distribution network post-disaster first-aid repair scheduling and load recovery collaborative optimization method and system
  • Two-stage power distribution network post-disaster first-aid repair scheduling and load recovery collaborative optimization method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0136]Next, the technical solutions in the embodiments of the present invention will be described in contemplation in the embodiment of the present invention, and it is clear that the described embodiments are intended to be in an embodiment of the invention, not all of the embodiments of the invention. Based on the embodiments of the present invention, there are all other embodiments obtained without making creative labor without making creative labor premises.

[0137]It should be understood that when used in this specification and the appended claims, the terms "include" and "including" indicating the description of the features, overall, steps, operations, elements, and / or components, but does not exclude one or Multiple other features, overall, steps, operations, elements, components, and / or their set presence or addition.

[0138]It should also be understood that the terms used in the specification of the present invention are merely the purposes of describing the particular emb...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a two-stage power distribution network post-disaster first-aid repair scheduling and load recovery collaborative optimization method and system. The method comprises the following steps: evaluating element damage conditions of a power distribution system; partitioning the fault points; carrying out preliminary recovery by using the distributed power supply, establishing a nonlinear programming model of the preliminary recovery, obtaining a linearized network reconstruction model, and solving to obtain a load recovery result of a first stage without considering a maintenance process as an initial recovery result; solving a collaborative optimization model of first-aid repair personnel allocation and load recovery by taking the maximum load recovery amount and the minimum recovery time as targets to obtain a network reconstruction time sequence change process, a first-aid repair personnel advancing line and a load recovery sequence result of a second stage considering maintenance scheduling; and as a final result for guiding the operation personnel to carry out post-disaster recovery, carrying out collaborative optimization. The post-disaster recovery capability of the power distribution network is improved, the downtime and the economic loss are reduced, and the recovery capability of the power distribution system is enhanced.

Description

Technical field[0001]The present invention belongs to the field of distribution system recovery force, which specifically involves a two-stage distribution network disaster repair scheduling and load recovery co-optimization method and system.Background technique[0002]Natural disasters and artificial attacks such as natural disasters in the world have brought serious impact on the safety operation of the power system, and the disaster has caused great losses to the national economy for a long time. With the frequent development of natural disasters, and the potential threat of human malicious attacks in the international situation is increasing, the power system is increasingly highly highlighted as the country's important infrastructure, and the significance of strategic facilities is increasing. Research on the improvement of electricity system recovery force in the face of extreme events is of great significance.[0003]The power system is directly related to the user load, while t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/04G06Q10/06G06Q10/00G06Q50/06
CPCG06Q10/04G06Q10/06311G06Q10/20G06Q50/06Y04S10/50
Inventor 武迪刘瑞环俞拙非孙厚涛赵晨陈晨
Owner STATE GRID ELECTRIC POWER RES INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products