Cast-in-place pile construction method capable of automatically adapting to soil layer

An automatic adaptation and pile filling technology, which is applied in the direction of cleaning methods using liquids, chemical instruments and methods, cleaning methods and utensils, etc., can solve problems such as extended construction period and difficult construction

Active Publication Date: 2021-09-10
ZHEJIANG IND POLYTECHNIC COLLEGE
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The existing general method is: after the drilling is completed, repeatedly pour clean water into the hole to clean the bottom and wall of the hole, so that the easy-flowing sediment is mixed into the water to form sewage, and then the sewage is drawn out, and repeated speculations are repeated many times. Cleaning up the pile hole to the hole wall and bottom only leaves relatively hard rock and soil. This method not only prolongs the construction period, but also makes the construction difficult when the pile hole passes through a complex multi-layer geological structure. In some cases, immersed pipes are required. Guard hole

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Cast-in-place pile construction method capable of automatically adapting to soil layer
  • Cast-in-place pile construction method capable of automatically adapting to soil layer
  • Cast-in-place pile construction method capable of automatically adapting to soil layer

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] The following are specific embodiments of the present invention and in conjunction with the accompanying drawings, the technical solutions of the present invention are further described, but the present invention is not limited to these embodiments.

[0027] This pile filling method comprises the following steps: A, drilling, in the process of pile rod 1 feeding, carry out water washing to pile hole hole wall synchronously, make the hole wall easily flowable silt be stripped; The pressure of flushing generally follows the following rules: The closer to the bottom of the pile hole, the greater the flushing pressure; B, pumping water, extracting the mud-water mixture remaining in the pile hole after the drilling is completed; C, lowering the reinforcement cage; D, pouring concrete, and completing the pouring after the concrete solidifies Pile construction.

[0028] The above construction methods can be drilled through a hole-free pile drilling device, such as figure 1 , ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a cast-in-place pile construction method capable of automatically adapting to a soil layer, and belongs to the technical field of civil engineering. The cast-in-place pile construction method comprises the following steps that A, punching is carried out, in the pile rod feeding process, water washing is carried out on the hole wall of a pile hole synchronously, and easy-flowing silt on the hole wall is stripped; the flushing pressure generally follows the following rules: the closer to the bottom of the pile hole is, the higher the flushing pressure is; b, water pumping is conducted, specifically, after punching is completed, a mud-water mixture left in the pile hole is pumped away; c, a reinforcement cage is lowered in; and D, concrete is poured, and construction of a cast-in-place pile is completed after the concrete is solidified. The method has the advantages of a short construction period, high efficiency and the like.

Description

technical field [0001] The invention belongs to the technical field of civil engineering, and relates to a pile filling method that automatically adapts to soil layers. Background technique [0002] The basic steps in the construction of cast-in-place piles are: drilling, clearing the holes, lowering the reinforcement cage, and pouring concrete. The interlayer of sand and soil is produced in the component, which affects the strength of the pile body. The existing general method is: after the drilling is completed, repeatedly pour clean water into the hole to clean the bottom and wall of the hole, so that the easy-flowing sediment is mixed into the water to form sewage, and then the sewage is drawn out, and repeated speculations are repeated many times. Cleaning up the pile hole to the hole wall and bottom only leaves relatively hard rock and soil. This method not only prolongs the construction period, but also makes the construction difficult when the pile hole passes throu...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E02D5/34E02D7/00B08B3/02E02D5/60
CPCE02D5/34E02D7/00B08B3/02B08B3/022E02D5/60
Inventor 罗烨钶洪进峰李积云
Owner ZHEJIANG IND POLYTECHNIC COLLEGE
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More