Steel plate hinged type segmented prefabricated assembled arch bridge and intelligent construction control method
A segmented prefabrication and control method technology, applied in arch bridges, erection/assembly bridges, bridges, etc., can solve problems such as high process requirements, uneven distribution of material strength, inaccurate control of structural alignment, etc., to simplify the construction process and improve The effect of manufacturing precision, improving construction efficiency and site applicability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0053] See attached figure 1 to attach image 3 , the embodiment of the present invention discloses a steel plate articulated segmental prefabricated arch bridge, comprising:
[0054] An abutment 1; there are two abutments 1; a sliding slope 11 is formed on the installation side of the abutment 1;
[0055] Segmental arch ring 2; the number of segmental arch rings 2 is multiple, and they are arranged side by side; Prefabricated wedge block 21; the top surface of prefabricated wedge block 21 is fixed with steel plate connector 4 by bolt 3;
[0056] In order to further optimize the above-mentioned technical solution, the height of the prefabricated wedge 21 is 400 mm, the top surface distance along the length direction of the segmental arch ring 2 is 500 mm, and the distance along the width direction of the segmental arch ring 2 is 1000 mm.
[0057] In order to further optimize the above technical solution, the number of steel plate connectors 4 on the top surface of each pref...
Embodiment 2
[0061] See attached Figure 4 , the prefabricated wedge-shaped block 21 is a solid concrete structure, and the joint surface of two adjacent prefabricated wedge-shaped blocks 21 is prefabricated with a protruding notch structure 211 that can be plugged and fitted; the protruding notch structure 211 is a raised cross type structure and recessed cross groove.
Embodiment 3
[0063] See attached Figure 5 , the prefabricated wedge block 21 is a hollow box-shaped concrete structure with both ends open, and the opening end of the prefabricated wedge block 21 faces the length direction of the segmental arch ring 2 .
[0064] On the basis of the above examples, see the attached Figure 6 , an intelligent construction control method for steel plate articulated segmental prefabricated assembled arch bridges, comprising the following steps:
[0065] S1, pouring the abutment 1 and performing maintenance;
[0066] S2. Prefabricate the prefabricated wedges 21 in the factory, and connect the prefabricated wedges 21 through the hinged buckle 41 according to the required length; at the same time, select a plurality of bonding points of two adjacent prefabricated wedges 21, and the bonding point is taken as the segmental arch ring 2 ends, middle points and quarter points; install stress strain gauges on multiple bonding points, and install laser displacement s...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com