Tower crane operation monitoring method and device, storage medium and processor
A technology for tower cranes and hanging objects, which is applied in the field of intelligent buildings, can solve the problems of tower cranes such as safety and hidden dangers, and achieve the effect of real-time monitoring and safe operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0131] This embodiment relates to a tower crane operating system, such as Figure 5 As shown, the tower crane operation system includes a tower crane cab 40, a construction site ground monitoring room 50, and a multi-machine scheduling platform 60. The tower crane cab 40 includes a black box 41, a face recognition unit 42, a height sensor 43, a directional sound unit 44, and a driver's cab. Alarm 45, battery power monitoring unit 46, luffing trolley camera unit 47, driver's cab camera 48 and driver's cab display unit 49, construction site ground monitoring room 50 includes computer client 51 and AI supercomputer 52, multi-machine dispatching platform 60 includes Multi-machine scheduling unit 61, computer client 51 displays personnel intrusion alarm video, triggers sound and light alarm, displays current and / or historical height, weight, wind speed and other sensor information, and performs alarm query; AI supercomputer 52 stores video and personnel Intrusion alarm picture.
...
Embodiment 2
[0135] This embodiment is the network connection scheme of the tower crane operating system in Embodiment 1, such as Image 6As shown, the network connection scheme of the tower crane car 70, the tower crane cab 40, the construction site ground monitoring room 50, and the multi-machine dispatching platform 60 is specifically shown. The tower crane car 70 includes a dome camera 71, a height sensor 43, a directional sound unit 44, and a battery power Monitoring unit 46, the first serial port to Ethernet module 72, the first remote IO module 73, the first switch 74 and the first wireless bridge 75, the dome camera 71 sends the video stream to the first switch 74, the height sensor 43 sends the first A data packet is transmitted to the first serial port to Ethernet module 72, and the first serial port to Ethernet module 72 transmits the second data packet to the first switch 74, and the first switch 74 transmits the data to the first wireless bridge 75, The first data packet is a ...
Embodiment 3
[0139] This embodiment relates to a specific monitoring method of the tower crane operation system, Figure 7 It is a flow chart of the monitoring method of the tower crane operation system, such as Figure 7 As shown, first, the visual platform starts reading data, then reads weight or height data, and then judges whether the weight data is greater than 80kg and whether the height data is greater than 3m. If the weight data is less than or equal to 80kg or the height data is less than or equal to 3m , re-read the data of the visual platform, and read the image of the hanging object when the weight data is greater than 80kg and the height data is greater than 3m. For the type of hanging object, call one of the dangerous frames (dangerous area frame) among the rebar / timber / trolley (tower crane trolley) that has been set up. If the hanging object is not recognized from the read image of the hanging object, Retrieve the dangerous frame of the steel bar that has been set, and the...