Underground metal mine stage stoping deep hole cutting and slot broaching method

A technology for cutting grooves and pulling grooves, which is applied in underground mining, surface mining, earthwork drilling and mining, etc. It can solve the problems of high construction cost, complicated process of cutting grooves and blasting, increased construction costs and construction period, and achieves quality assurance and construction efficiency, reducing the effect of surrounding rock sandwiching and reducing the amount of cutting work

Pending Publication Date: 2022-01-07
山东黄金矿业股份有限公司新城金矿
View PDF0 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Due to the high stage height, the cost of cutting the patio is high and difficult. With the increase of the construction height of the cut patio, it is difficult to guarantee the uprightness of the patio itself, and it is also difficult to guarantee the cross-sectional size of the patio construction, which often results in the shape of the patio being high at both ends and narrow in the middle. Patio tilt and other problems
The occurrence of these problems will greatly affect the cutting and pulling blasting of stage recovery, and even lead to the failure of cutting and pulling blasting, which cannot provide an effective initial compensation space for subsequent mining blasting
[0004] In view of the above problems, the underground metal mines at home and abroad mainly adopt the following two methods for cutting and pulling blasting: the first is to use a raise drilling rig to cut the raised well to ensure the size and uprightness of the raised well section, but the construction cost of this method is High, and the well-forming section of a general raise drilling rig is 0.9m in diameter, the space formed is not enough to provide compensation space for cutting and pulling blasting, so generally 2-3 cutting raises are required to be constructed, resulting in a substantial increase in construction cost and construction period
The second method is to further divide the stage into multiple sections, construct and cut the raised well in each section, carry out the cutting and pulling groove blasting in the section, and finally form the stage stope cutting groove that meets the blasting requirements, but this The method divides the stages into sections, which increases the amount of mining and cutting work, resulting in problems such as complex cutting and slotting blasting process and complex initiation network.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Underground metal mine stage stoping deep hole cutting and slot broaching method
  • Underground metal mine stage stoping deep hole cutting and slot broaching method
  • Underground metal mine stage stoping deep hole cutting and slot broaching method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0032] The technical scheme of the present invention is described in detail below in conjunction with accompanying drawing:

[0033] A deep hole cutting and drawing groove method for stage back mining of an underground metal mine, comprising:

[0034] Step 1. Select the position of the cutting groove. In this embodiment, the cutting groove is located in the center of the stope, the length is 13m the same as the width of the stope, and the width of the cutting groove is 3.5m.

[0035] Step two, such as figure 1 , 3 , 4, 5, along the height direction of the stage, the selected cutting groove is divided into upper and lower areas, namely the upper area and the lower area. The division principle is that the height of the lower area should be less than 20m, and the height of the upper area should be greater than 30m. In this embodiment, the height of the lower area is 18.5m, and the height of the upper area is 31.5m.

[0036] Step 3: Use medium and deep hole lateral blasting t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses an underground metal mine stage stoping deep hole cutting and slot broaching method. The method comprises the steps that 1, the position of a cutting slot is selected; 2, the selected cutting slot is divided into an upper area and a lower area in the stage height direction, and the upper area and the lower area are the upper area and the lower area; 3, slot broaching blasting is conducted on the lower area in a medium-length hole lateral blasting manner; and 4, slot broaching blasting is conducted on the upper area in a manner of blasting in a delta-shaped manner. According to the method, the cutting slot is divided into the upper area and the lower area according to the stage height for blasting, the difficulty of stage stoping cutting and slot broaching blasting is lowered, the extra mining and cutting work amount is not increased, the blasting difficulty is lowered, the construction period is shortened, the cutting quality and efficiency are improved, and cost is reduced.

Description

technical field [0001] The invention belongs to the technical field of mining engineering, and in particular relates to a method for cutting and pulling slots for stage mining in underground metal mines. Background technique [0002] The purpose of cutting groove blasting is to provide the initial free surface and blasting compensation space for underground stope mining. Therefore, the quality of cutting blasting and the shape of cutting grooves are very important to the recovery of the whole stope. [0003] When underground metal mines are mined using the stage mine method, the stage height is generally 40m~60m. How to form the initial blasting free surface in high stage mining has always been the key technology for the successful application of this type of method. Due to the high stage height, the cost of cutting the patio is high and difficult. With the increase of the construction height of the cut patio, it is difficult to guarantee the uprightness of the patio itself...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E21C41/22
CPCE21C41/22
Inventor 郭良银刘滨安龙蒋万飞宋召法刘晓光张金超牟占武张铭赵风臣张庆周波隋玉成孙霞王文文
Owner 山东黄金矿业股份有限公司新城金矿
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More