Building design method based on BIM technology

A technology of architectural design and technology, applied in design optimization/simulation, special data processing applications, geometric CAD, etc., can solve problems such as the frequency of information exchange depends on the system, the inability to implement on-site changes, and the loss of funds.

Pending Publication Date: 2022-01-28
山东新汉唐数据科技有限公司
View PDF0 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Third, in the actual construction process, site changes cannot be implemented according to the traditionally designed blueprint construction, and follow-up construction can only be carried out after re-discussion with the designer. Slow progress of the project, serious loss of funds
In short, in the workflow of traditional archit

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Building design method based on BIM technology

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] Further explanation of the specific embodiments of the present invention will be further described below with reference to the accompanying drawings and specific examples:

[0027] BIM technology appears, architects no longer use a simple two-dimensional drawings of three-dimensional space form to express frustration, it extends the operability of the architect for architectural form, so that the design and construction of building projects from the second Weimai into a three-dimensional, even four-dimensional digital ranks.

[0028] BIM design requires only a model can generate different views, when the details of the adjustment, but also modify the member can achieve the purpose of global adjustments. That building model BIM can be done directly structural calculations, comprehensive thermal calculation operation, energy-efficient computing, engineering, statistics and other processes, and can be adjusted item. BIM includes not only the full life cycle of information mode...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a building design method based on a BIM technology. The method comprises the following steps of conducting concept design: according to urban overall planning requirements and user requirements, building a preliminary model through site and environment simulation analysis, conducting scheme design: building a wind speed analysis model and a lighting analysis model on the preliminary model for simulation analysis, conducting scheme comparison and selection through analysis data and comprehensive factors, and estimating structure type selection, perfecting a scheme result: perfecting a scheme model, establishing a building center file database, covering the preliminary model with equipment rooms and pipeline lines, and forming an overall model, construction drawing design: importing the overall model design scheme into 3D max, carrying out collision detection and three-dimensional pipeline synthesis, adjusting and optimizing collided pipelines, and exporting an optimized two-dimensional construction drawing, and conducting projection imaging: using a BIM model rendering technology to present the optimization model design scheme, outputting various digital effect pictures of the design scheme, and stereoscopically presenting the digital effect pictures by using 3D projection.

Description

Technical field [0001] The present invention belongs to the field of building technology, artificial intelligence relates to the design, particularly to a method of building design BIM Technology. Background technique [0002] Traditional construction industry design process can be divided into the design phase, preliminary design phase, construction design phase of the three phases. Program design stage, designers approached the task and in the on-site investigation, according to the design plan conceived to meet the design requirements of the program and all kinds of drawings, specifications, major equipment selection, technical and economic indicators, summary plan description and overall strengths and weaknesses; and recommendations, the final report design and optimize the design. Preliminary design stage, building professionals with other professionals to provide information to each other, to coordinate the relationship between the various types of work after the individual...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06F30/13G06F30/20
CPCG06F30/13G06F30/20
Inventor 高玉生马仁怀朱明龙
Owner 山东新汉唐数据科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional