Progressive bedding hydraulic cave-making construction method in single-cline coal seam recovery working face
A technology of mining working face and construction method, applied in drainage, ground mining, mining equipment, etc., can solve the problems of low gas drainage efficiency, downward drilling, and difficulty in drilling drainage and slag discharge, so as to promote the utilization of resources , the effect of reducing emissions
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0021] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below. Obviously, the described embodiments are part of the embodiments of the present invention, rather than All the embodiments; based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts all belong to the protection scope of the present invention.
[0022] Such as figure 2 As shown, a progressive layer-by-bed hydraulic cave-making construction method in a monoclinic coal seam recovery working face includes the following steps.
[0023] S1: Arrange the mining face 1 along the direction of the monoclinic coal seam, and use the drilling and punching integrated drilling rig to construct the bedding drilling hole I4 from the deep mechanical airway 2 of th...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 

