Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Building method and structure of drainage ditch of road reconstruction and extension roadbed

A drainage ditch and road technology, applied in buildings, waterway systems, water supply devices, etc., can solve the problems of building materials that have not been recycled, and green road construction that has not formed sustainable energy-saving and emission-reducing resources, so as to reduce environmental pollution and carbon emissions, the realization of prefabrication, and the effect of wide application prospects

Pending Publication Date: 2022-04-29
XIAN HIGHWAY INST
View PDF5 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The biggest problem with this method is that it does not fully analyze the characteristics of the reconstruction and expansion road construction with the concept of drainage engineering characteristics design, and does not explore the recycling of demolished mortar blocks, concrete blocks, steel bars and other building materials. It is inconsistent with the concept of ecological civilization construction advocated at the national level, and has not formed sustainable application of resources and green road construction for energy saving and emission reduction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Building method and structure of drainage ditch of road reconstruction and extension roadbed
  • Building method and structure of drainage ditch of road reconstruction and extension roadbed
  • Building method and structure of drainage ditch of road reconstruction and extension roadbed

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments It is a part of embodiments of the present invention, but not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0031] Below in conjunction with accompanying drawing, the present invention is described in further detail:

[0032] The invention provides a method and structure for building drainage ditches for road reconstruction and expansion.

[0033] refer to figure 1 , the present invention provides a road reconstruction and expansion subgrade drai...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a road reconstruction and extension roadbed drainage ditch masonry method and structure, and the method comprises the steps: crushing a masonry material for road dismantling to obtain coarse aggregate, fine aggregate and fine material; mixing and stirring the coarse aggregate, cement and water to obtain a first mixture; mixing the fine aggregate, the cement, the water and the additive to obtain a second mixture; the first mixture is placed in different prefabricated drainage ditch mold plates, and side wall prefabricated blocks and base prefabricated blocks are obtained; after an original roadbed slope is treated, a drainage groove is dug; fine materials are laid on the bottom face of the drainage groove, and second mixed materials are laid on the fine materials and the side wall of the drainage groove; a base precast block and a side wall precast block are laid on the cement mortar leveling layer, and the bottom end of the side wall precast block is connected with one end of the base precast block. According to the method, road materials are dismantled, conventional cast-in-place concrete is replaced with the prefabricated drainage ditches, resource utilization of building waste is improved, meanwhile, prefabrication and standardization of building components are achieved, and the construction efficiency is improved.

Description

technical field [0001] The invention relates to the technical field of highway engineering drainage ditches, in particular to a method and structure for building drainage ditches for road reconstruction and expansion. Background technique [0002] Due to the rapid growth of traffic volume and the gradual decline of the performance of old expressways, road reconstruction and expansion will be an important practical activity of road construction in my country in the future. Compared with conventional highway engineering construction, road reconstruction and expansion involve many key technologies such as milling of original road surface, removal of protection and drainage facilities, splicing of subgrade and pavement, and reinforcement and splicing of structures such as bridges and culverts. Factors considered in the construction of reconstruction and expansion projects are more complicated, and the construction is more difficult. Also because the reconstruction and expansion ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E03F3/04E03F3/06
CPCE03F3/046E03F3/06Y02A30/60
Inventor 刘洪辉王瑛张泳樊建兴冯玉荣李晓娟赵海森周俊屠彬王旭李耀龙袁龙
Owner XIAN HIGHWAY INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products