Novel expansion filling material and preparation method thereof
A filling material and a new type of technology, applied in the field of mining engineering, can solve the problems of non-top filling, hidden dangers of mine safety production, and unsatisfactory roofing rate, etc., and achieve low filling costs, control of surface subsidence, and excellent expansion performance Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
preparation example Construction
[0021] The invention provides a technical solution: a new type of expansion filling material and its preparation method. The new type of expansion filling material is composed of the following main components: cementitious material, mine tailings, expansion agent and stabilizer. The composition content and mass ratio are: slag 325# cement 6.71%-13.65%, mine tailings 50.09%-54.58%, filling water 26.84%-33.42%, expansion agent 6.38%-9.64%, stabilizer 2.16%-3.25%, The expansion agent is a static breaking agent, which is divided into type II or type III according to different temperature requirements. The stabilizer is preferably methyl cellulose ether, and the cementitious material is preferably ordinary Portland cement, slag Portland cement, pozzolanic silicate One or more of cement, fly ash Portland cement and composite Portland cement, when adding expansion agent, under the conditions of economical rationality and small change in filling body strength, the expansion rate can be...
Embodiment 1
[0024] Slag 325# cement 500.00Kg, mine graded tailings 2000.00Kg, filling water 1317.50Kg, static breaking agent 175.00Kg, stabilizer 82.24Kg.
[0025] The expansion rate of a new type of expansion filling material prepared according to the above components is 2.50%. The filling material initially sets in 1.5h, final sets in 32.0h, the expansion start time is 1.5h, and the expansion termination time is 26.0h. The compressive strength is 0.8MPa, and the 28d strength is 2.2MPa. It can actively apply pressure joints to fill the goaf and effectively support the overlying strata, thereby achieving the purpose of controlling ground subsidence.
Embodiment 2
[0027] Slag 325# cement 400.00Kg, mine graded tailings 2400.00Kg, filling water 1503.20Kg, static breaking agent 252.00Kg, stabilizer 118.66Kg.
[0028] The expansion rate of a new type of expansion filling material prepared according to the above components is 4.70%. The filling material initially sets in 1.8h, final sets in 38.0h, the expansion start time is 1.2h, the end expansion time is 34.0h, and the 1d resistance The compressive strength is 0.60MPa, and the 28d strength is 2.00MPa. It can actively apply pressure joints to fill the goaf and effectively support the overlying rock strata, thereby achieving the purpose of controlling ground subsidence.
PUM
Property | Measurement | Unit |
---|---|---|
compressive strength | aaaaa | aaaaa |
strength | aaaaa | aaaaa |
compressive strength | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com