An automatic deviation correction and deep hole technology, which is applied to the automatic control system of drilling, directional drilling, earthwork drilling and production, etc., can solve the problems of delayed construction period, complicated deviation correction process, high project cost, etc., and achieve the effect of improving drilling quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0051] A kind of borehole automatic correction method in deep hole drilling of coal field drilling, such as figure 1 As shown, the deviation correction method includes the following steps:
[0052] S1. Site leveling
[0053] Ensure that the site is flat, so that the reserve mud is 1-2m higher than the construction water level, and prevent the hole from collapsing due to the pressure inside the hole being lower than the pressure outside the hole during the drilling process;
[0054] S2. Determine the hole position
[0055] After confirming the drilling position, move the drilling machine to the construction position;
[0056] S3. Set up the drilling rig platform
[0057] The center of the wire rope operating the drilling rig should be aligned with the center of the pile;
[0058] S4. The drilling rig is in place and corrected
[0059] After the drilling rig is in place, it is corrected, and the base is flat and stable to ensure that no inclination and displacement occur du...
Embodiment 2
[0071] A kind of borehole automatic correction method in deep hole drilling of coal field drilling, such as figure 1 As shown, the deviation correction method includes the following steps:
[0072] S1. Site leveling
[0073] Ensure that the site is flat, so that the reserve mud is 1.82m higher than the construction water level, and prevent the hole from collapsing due to the pressure inside the hole being lower than the pressure outside the hole during the drilling process;
[0074] S2. Determine the hole position
[0075] After confirming the drilling position, move the drilling machine to the construction position;
[0076] S3. Set up the drilling rig platform
[0077] The center of the wire rope operating the drilling rig should be aligned with the center of the pile;
[0078]S4. The drilling rig is in place and corrected
[0079] After the drilling rig is in place, it is corrected, and the base is flat and stable to ensure that no inclination and displacement occur du...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com