Unlock instant, AI-driven research and patent intelligence for your innovation.

Horizontal positioning structure, segment assembly bridge girder erection machine and construction method of segment assembly bridge girder erection machine

A technology of horizontal positioning and bridge erecting machine, which is applied in the direction of erecting/assembling bridges, bridges, bridge construction, etc., which can solve the problems of machine body level influence, abutment construction efficiency and quality influence, etc., to achieve convenient work and ensure overall economic benefits , Improving the effect of construction quality and construction efficiency

Pending Publication Date: 2022-07-29
THE SECOND ENG OF THE THIRD ENG GROUP OF CHINA RAILWAY +1
View PDF9 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] For the construction of the first abutment, the abutment is hoisted on the abutment. After the construction of the first abutment is completed, the bridge erecting machine will build the next abutment based on the first abutment. During this process, the outriggers of the bridge erecting machine will be supported on the first abutment. Because the abutment surface is not flat, it will have an impact on the levelness of the machine body, which in turn will affect the construction efficiency and quality of the subsequent abutments.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Horizontal positioning structure, segment assembly bridge girder erection machine and construction method of segment assembly bridge girder erection machine
  • Horizontal positioning structure, segment assembly bridge girder erection machine and construction method of segment assembly bridge girder erection machine
  • Horizontal positioning structure, segment assembly bridge girder erection machine and construction method of segment assembly bridge girder erection machine

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0034] The technical solutions in the embodiments of the present invention will be clearly and completely described below. The embodiments of the present invention, and all other embodiments obtained by those of ordinary skill in the art without creative work, fall within the protection scope of the present invention.

[0035] see Figure 1 to Figure 9 , the present invention provides a technical solution: a horizontal positioning structure, the technical solution includes

[0036] The main body 2 of the bridge erecting machine, the two sides and both ends of the main body 2 of the bridge erecting machine are symmetrically fixed with a level 3, the four corner positions of the bottom end face of the main body 2 of the bridge erecting machine are provided with outriggers, and the bottom ends of the outriggers are fixedly provided with , the support leg base 4, and the support leg base 4 is placed on the abutment 1;

[0037] Leveling mechanism 5, the leveling mechanism 5 adjus...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a horizontal positioning structure, a segment assembly bridge girder erection machine and a construction method of the segment assembly bridge girder erection machine, and mainly aims to improve and optimize the problems of poor position levelness and difficulty in leveling in the construction process of the bridge girder erection machine. The stable levelness of the machine body can be well judged, then corresponding regulation and control are conducted according to the actual deflection condition, then the locking assembly and the locking auxiliary part are used in cooperation, the leveled horizontal state of the machine body can be locked, the regulation and control stability of the machine body is improved, convenience is brought to work of constructors, and the working efficiency of the constructors is improved. And finally, construction quality and construction efficiency are improved, and overall economic benefits are guaranteed.

Description

technical field [0001] The invention relates to the technical field of building construction, in particular to a horizontal positioning structure, a segment assembling bridge erecting machine and a construction method thereof. Background technique [0002] Bridges refer to buildings built for roads to cross natural or artificial obstacles, so that vehicles and pedestrians can pass smoothly; bridges are generally composed of superstructure, substructure and auxiliary structures. The superstructure mainly refers to the bridge span structure and supports. system; substructure including abutments, piers and foundations. [0003] For the construction of bridges in the prior art, the segmental assembling bridge erection machine is usually used for construction. After the piers are constructed, the segmental assembling bridge erecting machine builds the abutments on the piers one by one, and then the construction personnel carry out the subsequent stages. processing work. [0004...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01D21/00G01C9/00
CPCE01D21/00G01C9/00
Inventor 张远征赵风岭安延伟潘武占潘玉平张广乐马良张峰薛军刘承宏张春阳
Owner THE SECOND ENG OF THE THIRD ENG GROUP OF CHINA RAILWAY