Tunneling and supporting method for roadway in soft filling body
A technology for filling the body and roadway, which is applied in tunnels, earthwork drilling, tunnel lining, etc., can solve the problems of large size of cantilever roadheader equipment, unsatisfactory blasting excavation, lack of applicability and flexibility, etc., and achieve rapid The effect of modular rapid support, reduction of labor intensity and cost, and control of section forming quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments; based on the embodiments of the present invention, All other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.
[0031] A method for excavating a roadway in a soft filling body, which is characterized in that it comprises the following steps:
[0032]Step 1. Manufacturing and processing of roadway excavation and support equipment. Roadway excavation equipment 4 is modified from an excavator, retaining the main body 4-1 of the excavator, and replacing the bucket of the excavator with a milling cutter 4-2, milling cutter 4 -2 can be rotated and cut around its axis, as the equipment for non-explosiv...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


