Production and treating process for high efficient percolate finishing agent for urban refuse cite
A technology for urban waste and production methods, which is applied in oxidation water/sewage treatment, flocculation/sedimentation water/sewage treatment, etc., can solve the problems of leachate leakage, eye water well pollution, crop pollution, etc., to reduce operating costs and investment. And the effect of low operating cost and saving land resources
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0036] Take the production of 1 ton of JQC treatment agent as an example. It is divided into 1#drug and 2#drug.
[0037] ①Producing 1# treatment agent
[0038] Measure 500kg of hydrochloric acid into an enamel reaction tank, add 338kg of water, start stirring, gradually add 150kg of aluminum ash, 10kg of alumina, and 2kg of iron oxide, and continue to stir and react for 5 hours until the Baume degree reaches 1.20. Stop the reaction and cool to normal temperature. 1#treatment agent.
[0039] ②Producing 2# treatment agent
[0040] Weigh 250kg of calcium carbonate, 20kg of bleaching powder, add 730kg of water, and stir evenly to obtain 2# treatment agent.
Embodiment 2
[0042] ①Producing 1# treatment agent
[0043] Measure 350kg of hydrochloric acid into an enamel reaction tank, add 340kg of water, start stirring, gradually add 300kg of aluminum ash, 4kg of aluminum oxide, and 5kg of iron oxide, continue to stir and react for 3 hours, until the Baume degree is 1.30, stop the reaction, and cool to normal temperature. 1#treatment agent.
[0044] ②Producing 2# treatment agent
[0045] Weigh 80 kg of calcium carbonate, 100 kg of bleaching powder, add 820 kg of water, and stir evenly to obtain 2# treatment agent.
Embodiment 3
[0047] The operation of processing landfill leachate.
[0048] The amount of sewage to be treated is 10 tons. Add 3kg of JQC 1# treatment agent for the first time, add in front of the pump, and stay for 30 minutes; add 2kg of 1# treatment agent for the second time, and settling time 15 minutes; enter the disinfection tank and add 1kg of 2# treatment agent for the third time, and stay 20 minutes. Processing is complete.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 