Filling free vibroflotation method
A vibrating method and no filler technology, which is applied in the fields of soil protection, construction, infrastructure engineering, etc., can solve the problems of increasing project investment and construction difficulties, and achieve the effects of saving construction costs, simple construction, and improving high-quality rate
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0007] Embodiment 1 Determined the vibrating construction parameters of the filler-free vibrating method through experiments:
[0008] 1. The construction area should be drained first before the construction using the ‘filler-free vibrating method’. Since the groundwater level is high after hydraulic sand filling, the construction site should be properly dewatered and drained. Precipitation and drainage can adopt conventional methods such as drainage ditches, etc. It is advisable to lower the groundwater level to meet the normal movement of the vibrating machine. Generally, the groundwater level should be lowered to about 1m above the ground. In addition, drainage work should be done well during and after vibrating construction to prevent excessive water accumulation.
[0009] 2. The vibrating machinery adopts "herringbone"-shaped steel beams, one machine with two or three cranes, that is, one crane passes through a "herringbone"-shaped steel beam with two or three vibrators t...
Embodiment 2
[0017] Example 2 An application example of the non-filler vibrating method in a road yard in a container port area. The road yard in a container port area is located on the beach between the old and new embankments of the Yangtze River. The elevation of the beach is -0.1m-1.0m. Due to the low elevation of the original ground of the site, silty sand with a thickness of about 4.0m-5.5m was dredged and filled on it. The particles of the dredged filled sand are uniform, and the silt and fine sand particles with a particle size greater than 0.0075mm have a content of more than 85% and a high water content. , The mud content is generally less than 5%. The underground foundation soil layer of the original beach in this area is roughly divided into five layers from top to bottom. The first layer is silt mixed with silty clay; the second layer is silty silty clay mixed with silt; the third layer is silt; The fourth layer is a saturated soft clay layer, gray, soft plastic, partially si...
PUM
Property | Measurement | Unit |
---|---|---|
Particle size | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com