Making process of building roof waterproof and heat insulating layer
A manufacturing method and technology of thermal insulation layer, applied in building thermal insulation materials, building structure, construction, etc., can solve problems such as water seepage, cracks in leveling layer, failure to find and repair in time, and achieve prevention of rainwater leakage, good anti-corrosion Leakage effect, avoid light aging effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0006] Example 1: In a residential building, leave a drain in the bathroom to communicate with the sewer for water and air drainage. After the concrete hollow slabs are installed tightly, cover the depression so that the drain is at the lowest position and cover it with wire mesh , spray the anti-seepage liquid once, and brush it twice with 986 waterproof glue after drying. After the waterproof glue dries at an interval of 0.5 hours, use the anti-seepage liquid to mix cement perlite to make the insulation layer, and cover the insulation layer with old newspapers. Apply anti-seepage cement mortar, normal maintenance for 7 days, smooth the cracks with 968 waterproof glue mixed with cement, and then apply 968 waterproof glue twice, with an interval of 1 hour, after drying, cover it with old newspapers and then wipe it with cement mortar on the covering 20mm thick, cover the cracks after curing and apply waterproof glue twice. Tested for 3 months without leakage and infiltration. ...
Embodiment 2
[0007] Embodiment 2: Polystyrene rigid foam board is used for the insulation layer, and the anti-seepage cement water slurry is directly applied, and the rest are the same as in Example 1. The test is 3 months without seepage, concentration, and infiltration.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More