Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

11results about How to "Guaranteed resource utilization" patented technology

Computing resource configuration method and device of FPGA (Field Programmable Gate Array) equipment and FPGA equipment

The embodiment of the invention provides a computing resource configuration method and device of FPGA equipment and the FPGA equipment. The method comprises the steps that a heterogeneous query execution plan is generated according to a query request of a user, and the heterogeneous query plan comprises heterogeneous operators and non-heterogeneous operators; and determining a first number of resource blocks required to be configured for executing the heterogeneous operator based on the calculation throughput for processing a non-heterogeneous operator adjacent to the heterogeneous operator and the calculation throughput which can be provided by a single resource block in a programmable array logic FPGA (Field Programmable Gate Array) device. Through the embodiment of the invention, the problems that the throughput of the FPGA equipment is not matched with the calculation throughput of the CPU and the resources of the FPGA equipment cannot be reasonably utilized in the current dynamic configuration scheme in the related technology are solved, and the effect of ensuring that the resources of the FPGA equipment are reasonably utilized in the query acceleration process of the database is achieved.
Owner:ZTE CORP

SFC deployment and migration method in giant low earth orbit satellite constellation of mobile perception

The invention discloses an SFC deployment and migration method in a giant low-orbit satellite constellation of mobile perception, and the method comprises the steps: 1, carrying out the information exchange of all controllers according to an SFC set to be deployed, and constructing a simplified topology; step 2, executing a subnet selection algorithm by each controller in parallel; step 3, performing network information exchange by each controller to obtain a VNF (Virtual Network Function); 4, the current controller obtains all the tasks to be executed; and step 5, each controller performs network information exchange again, the SFC set failed in deployment is put into the SFC set waiting for deployment of the next execution process according to information transmitted by other subnets, the step 1 is returned, the satellite network is divided into a plurality of subnets according to the orbit and the coverage range of the satellite, and the sub-networks are distributed in the next execution process. The satellites in each subnet are relatively fixed and are close to each other, so that relatively low communication delay can be ensured, and a simplified topological structure is designed in each subnet, so that a controller in the subnet can efficiently manage and deploy the SFC.
Owner:BEIJING UNIV OF POSTS & TELECOMM

Ore production dust removal device and method

The invention relates to the technical field of ore dust removal, in particular to an ore production dust removal device and method. The dust removal mechanism is fixedly installed on one side of the top end of the base through a supporting frame, the whole dust removal mechanism is inclined, the dust removal mechanism is provided with a water spraying and dust falling assembly used for conducting dust removal on the moving ore, the bottom end of the water spraying and dust falling assembly is connected with a flow guide net plate allowing the ore to move, and a plurality of through holes are formed in the flow guide net plate; a periodic jacking assembly used for jacking the ore is arranged below the hydraulic cylinder; and the flow guide plate is fixedly mounted at the obliquely downward end of the flow guide net plate. In the actual use process, circumferential water spraying treatment on ore is effectively achieved, the dust removal effect is improved, slime is layered in the dust removal process, water resources used in the dust removal process are recycled, resource waste in the whole ore dust removal process is reduced, the utilization rate of ore products is increased, and the production cost is reduced. And subsequent use is facilitated.
Owner:WANNIAN COUNTY DAYUAN HIGHWAY BUILDING MATERIALS CO LTD

Consensus method and device for wireless block chain network

The invention provides a wireless block chain network consensus method and device, and the method comprises the steps: obtaining a contention window parameter of a corresponding block of a first consensus round at a pre-pre stage, and updating a contention window parameter of a corresponding block of a second consensus round, according to redundant data counted by the counter array of the block corresponding to the first consensus round, adjusting the forwarding probability of all nodes of the block corresponding to the second consensus round when the pre-pre message is broadcasted, and obtaining the pre message; and determining that honest node consensus succeeds under the condition that the pre-part message sequentially passes the broadcast and verification of the pre-part stage and the commit stage, and uploading a block corresponding to a second consensus round to a wireless block chain network. According to the method provided by the invention, the contention window in the network and the forwarding probability are automatically adjusted when the new block is generated, so that the channel resource utilization rate and the network operation efficiency are improved.
Owner:BEIJING UNIV OF POSTS & TELECOMM

Multimodal medical image segmentation method and system based on SAM model

The embodiment of the present invention discloses a multimodal medical image segmentation method and system based on a SAM model, the method comprising: a construction step: constructing a SAM model for segmenting multimodal medical images, the model comprising an image encoder, a mask decoder, a prompt encoder, a modality encoder and a modality perception module; a training step: using cross entropy loss and Dice loss to train the SAM model; a segmentation step: the SAM model outputs the segmentation results of each object in the multimodal medical image according to the click prompt or the object frame prompt. The present invention realizes the multimodal expansion of the SAM model by introducing a lightweight modality encoder and a modality perception module, avoids the huge computational overhead of retraining a large model for each multimodal task, improves the segmentation performance of medical images, thereby realizing the efficient application of SAM in multimodal medical image segmentation tasks, and further improves the accuracy and reliability of diagnosis.
Owner:UESTC (SHENZHEN) ADVANCED RES INST

Stream-oriented computation-based visual computation model construction method

The invention relates to the technical field of stream-oriented computing, in particular to a visual computing model construction method based on stream-oriented computing. The method comprises the following steps: acquiring a streaming computing data set; performing data preprocessing on the streaming computation data set to obtain a standard streaming computation data set; extracting calculation nodes of the standard stream-oriented calculation data set to obtain calculation node data; performing correlation analysis on the calculation node data to obtain node correlation data; performing network configuration analysis on the calculation node data to obtain node network configuration data; performing node type analysis on the calculation node data to obtain node type data; and performing node function analysis according to the node type data to obtain node function data. Therefore, by means of the Internet of Things technology, the intelligent control technology, the visualization technology and the block chain technology, the dynamic adjustment and distribution capacity of flow-oriented computing is improved, and the real-time monitoring and feedback capacity of a visual computing model of flow-oriented computing is enhanced.
Owner:胡建成

Deep learning task execution method and device based on running time length prediction

ActiveCN119597601AGuaranteed resource utilizationGuaranteed execution efficiencyProgram initiation/switchingResource allocationTime domainAlgorithm
The invention discloses a deep learning task execution method and device based on running time length prediction. The method comprises the following steps: executing a target deep learning task according to a current task allocation strategy through each computing node in an intelligent computing cluster, and obtaining a performance monitoring data sequence of computing resources on each computing node within a specified duration after the target deep learning task is executed for the specified duration, processing the performance monitoring data corresponding to each computing node, and for target monitoring data corresponding to each computing node, extracting a time domain feature of the target monitoring data in a time domain and a frequency domain feature of the target monitoring data in a frequency domain; and inputting the time domain feature and the frequency domain feature into a pre-trained time length prediction model, determining a running time length required for completing the target deep learning task, and according to the running time length, adjusting a current task allocation strategy so as to execute the target deep learning task according to the adjusted task allocation strategy.
Owner:ZHEJIANG LAB

Heterogeneous computing network resource abnormity monitoring and early warning method

PendingCN121984834AGuarantee the quality of operationGuaranteed resource utilizationTransmissionAnomaly detectionMonitoring system
According to the heterogeneous computing network resource abnormity monitoring and early warning method, unified modeling, unified acquisition processing and unified monitoring are carried out on heterogeneous computing network resources, so that mutual separation of monitoring systems can be avoided, root cause positioning can be assisted, abnormity checking efficiency can be improved, abnormity influence range deduction is carried out based on root causes and topology, and the method has the advantages of being high in practicability and the like. The method is favorable for defining the influence range of exception on tenant services, and comprises the following steps: step 1, carrying out unified collection and processing on heterogeneous resource monitoring data based on a unified monitoring model and an index processing rule; 2, monitoring index anomaly detection is carried out based on an index monitoring threshold value; 3, searching a multi-index anomaly joint detection rule, performing joint detection analysis on a single anomaly monitoring index in combination with the resource topology, and if a matching rule does not exist, directly outputting an anomaly index; 4, auditing resource topology, inferring an abnormal influence range and outputting an inference result; and step 5, performing unified abnormity early warning according to the inference result.
Owner:BEIJING ZZNODE TECH CO LTD

A device resource application method and device, electronic device, and storage medium

ActiveCN115391001BGuaranteed resource utilizationImprove task execution efficiencyComputer hardwareOperating system
The application discloses a device resource application method and device, an electronic device and a storage medium. The method comprises the following steps: determining a single container demand quantity for a GPU resource card indicated by a task request in a current task request set; determining a whole machine card quantity of a GPU device in a device cluster; based on the whole machine card quantity and the single container demand quantity indicated by the task request, constructing a task request group in which the sum of the indicated single container demand quantities matches the whole machine card quantity, so as to apply for corresponding GPU device resources based on the task request group. The application can guarantee that the whole machine resources are applied to the device as much as possible at the task request level, thereby reducing the GPU resource cards in the form of fragments, effectively guaranteeing the device resource utilization rate and load balancing. Especially for the case where the task request is sufficient, the task execution efficiency can be improved.
Owner:TENCENT TECHNOLOGY (SHENZHEN) CO LTD

Multi-modal automatic driving image segmentation method and system based on SAM model

The embodiment of the invention discloses a multi-modal automatic driving image segmentation method and system based on an SAM model, and the method comprises the steps: a construction step: constructing the SAM model which comprises an image encoder, a mask decoder, a prompt encoder, a modal encoder and a depth perception module; a training step: training the model by using cross entropy loss and Dice loss; and an identification step: inputting the multi-modal automatic driving image into the model, and outputting a segmentation result of each object in the automatic driving image. According to the invention, the lightweight modal encoder and the depth sensing module are introduced, feature coding of depth information or other modal information is realized, the depth sensing module injects the coded depth information into a backbone network of the SAM model, and alternate enhancement of depth features and RGB features is realized, so that multi-modal expansion of the SAM model is realized, and the robustness of the SAM model is improved. And the huge calculation cost caused by retraining a large model for each multi-modal task is avoided.
Owner:SHENZHEN TIANHAI CHENGUANG TECH CO LTD

An intelligent scheduling method for space-time collaborative operations based on digital twin simulation

The present invention provides an intelligent scheduling method for simulating spatiotemporal collaborative operations based on digital twins, which relates to the field of intelligent scheduling technology, including: S1: collecting combat-related data, building a digital twin model based on the combat-related data, and verifying the digital twin model, wherein the combat-related data includes scene data, environmental data, equipment parameters, and historical combat data; S2: dividing resource categories according to battlefield information, matching equipment for each resource category, and forming a resource group; S3: obtaining scheduling tasks, and using a multi-dimensional scheduling algorithm in the digital twin model to perform optimal scheduling according to the scheduling tasks and resource groups, and obtaining the optimal scheduling plan for the scheduling tasks. The present invention not only formulates a comprehensive and detailed scheduling plan based on the three core dimensions of tactical effect, resource utilization, and energy efficiency, but also can flexibly adjust and give corresponding optimization plans according to changes in combat needs.
Owner:WUHAN HEXIAN TECH CO LTD