A climbing formwork and hydraulic lifting technology, applied in formwork/formwork/work frame, on-site preparation of building components, construction, etc., can solve the problems of large bearing capacity and low steel consumption of support rods, and achieve large bearing capacity. , The effect of small steel consumption and safe operation method
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0078] Embodiment 1 Referring to Figure 1-6, the steps of using the hydraulic climbing formwork to construct the wall:
[0079] (1), see Figure 1, bind the steel bars at the initial layer, install the formwork system and hydraulic lifting system, and connect the formwork system and the operating platform system into a whole by the hydraulic lifting system.
[0080] (2), referring to Fig. 2, pour concrete 25 in formwork by conventional construction method.
[0081] (3), referring to Fig. 3, concrete maintenance; During this period, the reinforcement 26 of the upper part is bound.
[0082] (4) When the concrete reaches the demoulding strength, the pull bolts of the formwork system are removed, and the formwork is retreated 80mm from the concrete by the stripper, see Figures 7 and 8.
[0083] (5), referring to Fig. 4, the supporting rod 6 descends to the concrete top surface or the top surface backing plate.
[0084] (6) Fix the support rod to the concrete top surface, see Figu...
Embodiment 2
[0101] Embodiment 2 Referring to Fig. 12, the steps of using the hydraulic climbing formwork to construct the column:
[0102] (1), see Figure 1, bind the steel bars at the initial layer, install the formwork system and hydraulic lifting system, and connect the formwork system and the operating platform system into a whole by the hydraulic lifting system.
[0103] (2), referring to Fig. 2, pour concrete 25 in formwork by conventional construction method.
[0104] (3), referring to Fig. 3, concrete maintenance; During this period, the reinforcement 26 of the upper part is bound.
[0105] (4) When the concrete reaches the demoulding strength, the pull bolts of the formwork system are removed, and the formwork is retreated 80mm from the concrete by the stripper, see Figures 7 and 8.
[0106] (5), referring to Fig. 4, the supporting rod 6 descends to the concrete top surface.
[0107] (6), use the semi-conical cast steel wedge to fix the supporting rod and the perforated hole on...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com