Method for realizing view linkage of road testing system
An implementation method and technology of views, applied in transmission systems, digital transmission systems, radio/induction link selection and arrangement, etc., can solve problems such as inconvenient positioning, and achieve the effect of reducing information indexing time and improving execution efficiency.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0028] The method for implementing view linkage of the drive test system of the present invention will be described below with reference to the accompanying drawings.
[0029] FIG. 1 is a structural diagram of the drive test system of the present invention. The drive test system involved in the present invention is divided into three layers, namely, a message interface analysis layer 103 , a wireless parameter analysis layer 102 and a system control and interface display layer 101 . The message interface analysis layer 103 is mainly responsible for receiving and sending signaling messages with test equipment (such as test mobile phones, frequency scanners, and GPS receivers, etc.), repackaging the instructions sent from the wireless parameter analysis layer, and constructing corresponding test Various operating instructions recognized by the device are encapsulated into corresponding commands and sent to external connected devices. At the same time, various messages sent from ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 