Method and apparatus for security controlling railway station train reception and departure

A safety control and train technology, applied in special data processing applications, instruments, electrical digital data processing, etc., can solve the problems of heavy physical labor, making and receiving train instructions, transmitting instructions and executing instructions errors, deviations and errors, etc. Achieve the effect of reducing labor intensity and improving safety control quality

Active Publication Date: 2008-04-16
ZHENGZHOU SANFANG SOFTWARE TECH
View PDF0 Cites 16 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In the existing safety assurance technology system for receiving and departing trains at stations, the supervision and assurance system is based on the mutual supervision and inspection of subordinates by leaders, corresponding reward and punishment measures, and excellent technical and professional quality of employees. As a result, the functions of the supervision and guarantee system will be affected by various factors such as environmental conditions, reward and punishment measures, personnel quality, personnel emotions, and personnel work and rest in the process of realization. There are serious flaws and deficiencies in
In the existing security technology system for receiving and dispatching trains at stations, the formulation, transmission, and inspection and supervision of train receiving and dispatching instructions rely on human control, verbal call response or telephone call response, and the transmission of train receiving and dispatching instructions only Can rely on verbal or telephone, which creates a series of security risks
Its serious flaws and deficiencies are: firstly, human control is used as a means of mutual supervision and inspection, and errors

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method and apparatus for security controlling railway station train reception and departure
  • Method and apparatus for security controlling railway station train reception and departure
  • Method and apparatus for security controlling railway station train reception and departure

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0047] This embodiment is a method for safety control of receiving and dispatching trains at a railway station, figure 1 It is a functional block diagram of the hardware system used in this embodiment, and the equipment used includes: a duty officer control host, a database, a switch, a recorder, a deputy duty officer control extension, multiple signalman control extensions, and multiple field control extensions, Train inspection control extension, car number control extension, broadcasting room control extension, passenger on-duty control extension, waiting room control extension, commodity inspection control extension, passenger transportation water supply control classification, crossing safety protection control extension, station entrance control extension, station dispatching The control extension, the exit control extension, the private room control extension, the meal supply control extension, and the local area network connected to the duty officer to control the host ...

Embodiment 2

[0200] This embodiment is a device for realizing the safety control method for receiving and dispatching trains at a railway station described in Embodiment 1. The device is as follows: figure 1 As shown, including: on-duty officer control host, safety control software, database, switch, recorder, deputy on-duty officer control extension, multiple signalman control extensions, multiple field control extensions, train inspection control extension, vehicle number control extension, Broadcasting room control extension, passenger on-duty control extension, waiting room control extension, commodity inspection control extension, passenger water supply control classification, crossing safety protection control extension, entry control extension, station adjustment control extension, exit control extension, row Private room control extension, meal supply control extension, local area network.

[0201] The attendant control host described in this embodiment is connected to the database...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a safety control method and device of reception and departure train, especially relates to a transport business center safety control system. The invention comprises watcher control mainframe, safety control software, data base, exchanger, recorder, assistant watcher, signaler, patrolman, train examinator, car number, broadcasting room, watcher of passenger transport, waiting room, commodity inspection, water-supply of passenger transport, railroad grade crossing safety protection, exit, dispatching station, entry, luggage house, food supply and control subset, local area network. The watcher control mainframe is connected with the data base, recorder, exchanger, each control subset by local area network and the safety control software runs in the system. In the said invention, the computer system replaces the artificial reception and departure train. In order to ensure the safety system can automatically recognize the maloperation, the operation of post sites immediately reacts on the safety control special interface and each post site has voice cue system. The recorder can provide reliable foundation to the safety administration.

Description

technical field [0001] The invention relates to a safety control method and device for receiving and departing trains at a railway station, which is a railway traffic safety control system, in particular to a transportation center safety control system. Background technique [0002] The operation organization process of a railway station connecting trains into the station and sending out trains from the station is called sending and receiving trains. Ensuring the driving safety of receiving and departing trains is the most important thing in the railway driving safety work. [0003] In order to ensure the driving safety of the train receiving and departing at the station, the existing safety guarantee system is composed of the following three aspects of equipment and rules and regulations. First, the station is equipped with electrical centralized equipment for receiving and dispatching trains. It is possible to arrange the walking path for the train to enter and leave the ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): B61L27/04G06F19/00
Inventor 王建军陈伯羽吴翠珑赵超峰喻强任保国潘国正邢良玉简彤邵大力尹志东张泓飞刘新贵冯晓鹏刘智慧朱丰收薄冰马强
Owner ZHENGZHOU SANFANG SOFTWARE TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products