Subsection retrusive slip-casting method for porthole slurry-stop mixed double-pipe
An external mixing and orifice technology, which is applied in earth-moving drilling, soil protection, wellbore lining, etc., can solve the problems such as the inability of the slurry to flow out of the orifice and the stuck drill, so as to ensure the grouting effect, reduce the construction technology, The effect of improving grouting efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0008] The embodiments of the present invention will be described with reference to the drawings:
[0009] The process steps of the grouting method proposed by the present invention are:
[0010] Such as figure 1 As shown, step 1 drills shallow holes. After the drilling rig 9 is in place, adjust the angle of the drilling rig according to the opening position and drilling parameters to meet the design drilling requirements, and the drilling is 1.8m.
[0011] Such as figure 2 As shown, step 2 exits the drill pipe and installs the orifice pipe 11, the drainage device 8, and the water inrush prevention device 6. The orifice tube 11 is made of seamless steel pipe, one end is welded with a quick joint 10, and the other end is sealed with cement mortar 19 by 20 cm. Before installation, start winding the hemp filament into a spindle shape at 30cm from the end of the orifice tube to the end of the quick connector, and put the anchoring agent 12 into the orifice, and use the drill 9 to pus...