Method for producing building buckle
A production method and a technology of fasteners, which are applied in construction, building structure, scaffolding connection, etc., can solve the problems of high production cost, rough and heavy appearance, complex and cumbersome production process, etc., and achieve fast production speed, simple production process, The effect of increasing the length of the R arc
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] Embodiment 1 Production of the cover plate: 1. According to the requirements on the material, select the corresponding steel plate, and punch out the blank of the designed shape with a blank-making punching machine.
[0022] 2. Put the blank into the heating furnace for heating. When the temperature of the blank reaches above 800°C, put the blank on the forming punching machine for stamping; punch out the arc curvature surface, main rib (2), inverted V-shaped side rib (3), Flat cushion pressure seat (1). The maximum R arc of the formed blank is ≥120°.
[0023] 3. After the blank to be formed is cooled naturally, use tools to remove the burrs generated during the stamping process.
[0024] 4. Put the cooled forming blank on the punching press, and punch out the flat pad press seats (1) on both sides of the fastener out of the bolt holes, one side is a closed circular hole, and the other side is an open hole.
[0025] 5. Put the blank after punching on the pouting machi...
Embodiment 2
[0027] Embodiment 2 The production of the middle part: 1. According to the requirements on the material, select the corresponding steel plate, and punch out a blank of a certain shape with a blank-making punching machine.
[0028] 2. Put the blank on the punching machine, and punch out 4 long round holes longitudinally along the direction of the cross line at the position where the bolt is installed.
[0029] 3. Put the blank on the heating furnace for heating. When the blank reaches 800°C or higher, put the blank on the molding machine for stamping, take it out, and cool it naturally.
[0030] 4. Use tools to remove the burrs generated during the stamping process.
[0031] 5. Put the formed workpiece on the inclined table with an inclination angle of 30° for secondary punching, and punch out the excess part in the bolt hole (6) due to stamping deformation, so that the margin between the bolt hole (6) and the bolt side is less than 3 mm.
[0032] 6. Forming.
[0033] The fa...