Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

TGRM subsection moving-on type advanced deep hole grouting construction process

A kind of construction technology, advanced technology, applied in mining equipment, earthwork drilling, tunnels and other directions, can solve the problems of wasting materials, slurry backflow, can not guarantee the grouting effect, etc., to ensure the construction safety and avoid damage effect.

Inactive Publication Date: 2010-10-27
BEIJING MUNICIPAL CONSTR +1
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

Its disadvantage is that this construction method uses drill pipe grouting, and there must be a gap between the drill pipe and the grouting hole, which will easily cause the grout to flow back during grouting, which wastes materials and cannot guarantee the grouting effect. Therefore, the double pipe grouting process adopts The grouting material is quick-setting cement-sodium silicate double liquid slurry (setting time within 1 minute) to prevent the backflow of the slurry, but the effective strength of the double liquid slurry can only be maintained for about a week, so the double pipe Grouting is only suitable for temporary grouting reinforcement that does not require a long time for the grouting reinforcement effect, and is not suitable for grouting reinforcement projects that require high settlement at the bottom of structures

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • TGRM subsection moving-on type advanced deep hole grouting construction process
  • TGRM subsection moving-on type advanced deep hole grouting construction process
  • TGRM subsection moving-on type advanced deep hole grouting construction process

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0030] Example: The 105-meter section of the double-hole tunnel between Xizhimen and Zoo of Beijing Metro Line 4 with mileage K14+0.0 to the east is located directly under the Gaoliang Bridge. The buried depth of the tunnel is about 14 meters, and the construction needs to cross the Xizhimen Gaoliang Bridge piles. The arch of the stratum where the tunnel structure is located is sand and pebbles, and the sand stratum below the arch waist. In order to ensure the safety of the sorghum bridge during the excavation of the interval tunnel, the "TGRM segmented advance advanced deep hole grouting construction technology of the present invention" is adopted. .

[0031] The TGRM segmented advancing advanced deep hole grouting construction process described in this embodiment is used in the construction of undercut tunnels, and it includes the following steps:

[0032] ①Stop excavation when the tunnel is excavated to the area where reinforcement is needed, seal the tunnel face, and construct ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a TGRM segmental advancing-type leading deep-hole grouting construction process. The construction process comprises the following steps that: a slurry stop wall is made first; a hole is drilled on the set hole position; an orifice pipe is arranged in the drilled hole; a drill bit is replaced; first-segment drilling is carried out through the orifice pipe; after a depth isreached, the drilling is stopped and a drilling tool is withdrawn; grouting corollary equipment is arranged on the orifice pipe, so as to inject TGRM cement-based special grouting material into stratum; after a grout soil body reaches certain strength, the grouting equipment is removed, and second-segment drilling is carried out through the orifice pipe; the two segments of drilling are repeated till the set hole depth is reached; and then the steps are carried out to another hole position till all grouting holes are completed. The construction process has the advantages that: aiming at subsurface tunnels, in particular to tunnels of which an arch part is positioned in an unbonded and in low self-stability sand layer and other stratum and passes through the bottom of a building, segmentaladvancing-type leading deep-hole grouting is carried out to the stratum, which can comprehensively reinforce the stratum, so as to further slow down or avoid the settlement after the stratum is destroyed and the damage to buildings (constructed objects).

Description

Technical field [0001] The invention refers to a TGRM segmented advance advanced deep hole grouting construction technology. As a necessary and effective means of preventing collapse and subsidence in construction, it is suitable for projects that require pre-reinforcement of the soil at the beginning of the construction of undercut tunnels. Especially for structures with strict settlement requirements (such as railways, rail transit, bridges, highways, etc.) that pass through the bottom of buildings and pass through, the tunnel structure is in unbonded, poorly stabilized sand and gravel (pebbles) layers, containing water Sand layer and loose geological soil layer. Background technique [0002] At present, the common grouting technology is the double pipe grouting technology. The double pipe grouting technology uses a double pipe drilling rig to drill to a predetermined depth and then performs backward grouting from the hollow drill pipe. The grouting material uses cement-water ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D9/04
Inventor 孔恒彭峰张继明王卓
Owner BEIJING MUNICIPAL CONSTR
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products