[0030] Example: The 105-meter section of the double-hole tunnel between Xizhimen and Zoo of Beijing Metro Line 4 with mileage K14+0.0 to the east is located directly under the Gaoliang Bridge. The buried depth of the tunnel is about 14 meters, and the construction needs to cross the Xizhimen Gaoliang Bridge piles. The arch of the stratum where the tunnel structure is located is sand and pebbles, and the sand stratum below the arch waist. In order to ensure the safety of the sorghum bridge during the excavation of the interval tunnel, the "TGRM segmented advance advanced deep hole grouting construction technology of the present invention" is adopted. .
[0031] The TGRM segmented advancing advanced deep hole grouting construction process described in this embodiment is used in the construction of undercut tunnels, and it includes the following steps:
[0032] ①Stop excavation when the tunnel is excavated to the area where reinforcement is needed, seal the tunnel face, and construct ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com