Compound double-layer drainage inspection well for rainwater and sewage
A composite double-layer, inspection well technology, applied in drainage structures, waterway systems, water supply devices, etc., can solve the problems of increasing inspection well investment, receiving water pollution, inconvenient pipeline wells, etc., to reduce later operation and maintenance costs, reduce Complexity, the effect of reducing investment costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] Example 1, see figure 1 , figure 2 and image 3 :
[0024] It can be seen from the figure that the inspection well mainly includes a well cover 1, a well body 2, a ventilation pipe 3, a well neck 4, a ladder 5, an intermediate movable interlayer 6, a movable opening and closing cover plate 7, and an interception hole / slot 8, etc. The well body 2 can be designed as a circle or a rectangle as required. The middle position of the well body is fixed with an intermediate movable interlayer 6, which divides the well body 2 into upper and lower layers. The connection of the upstream and downstream pipelines and the access of branch pipes are based on the intermediate movable interlayer Benchmark, where the lower layer is connected to sewage pipes and the upper layer is connected to stormwater pipes. Ventilation pipe 3 is provided on the middle movable interlayer 6 to connect the upper and lower layers to realize the normal ventilation and safe operation of the lower floor,...
Embodiment 2
[0025] Example 2, see Figure 4 , Figure 5 , Figure 6 :
[0026] As can be seen from the figure, the inspection well mainly includes a well cover 1, a well body 2, a ventilation pipe 3, a well neck 4, a ladder 5, an intermediate movable interlayer 6, a movable opening and closing cover plate 7, an interception hole 8, and an interception hole cover plate 9 , Spring 10, loose-leaf 11 etc. The well body 2 can be designed as a circle or a rectangle as required. The middle movable interlayer 6 is arranged in the middle of the well body, and the well body 2 is divided into upper and lower layers. Benchmark, where the lower layer is connected to sewage pipes and the upper layer is connected to stormwater pipes. The middle movable interlayer 6 is provided with a ventilation pipe 3 to connect the upper and lower layers to realize the normal ventilation and safe operation of the lower floor, and the top of the ventilation pipe 3 is higher than the top of the upper layer pipe cana...
Embodiment 3
[0027] Example 3, see Figure 7 , Figure 8 and Figure 9 :
[0028] The inspection well mainly includes a well cover 1, a well body 2, a ventilation pipe 3, a well neck 4, a people ladder 5, an intermediate movable interlayer 6, a movable opening and closing cover plate 7, loose-leaf 11 and the like. This inspection well is different from Example 1 and Example 2 in that no interception structure is set on the middle movable interlayer 6, so it can only realize the passage of rainwater and sewage in layers.
[0029] In the above three examples, the middle movable interlayer 6 has adopted the form of setting a movable opening and closing cover plate 7, which is a better way of realization, but it is not limited to this, and the overall movable opening and closing structure can also be adopted, that is, the middle The movable interlayer 6 is integrally connected with the well body in hinged or other movable connection forms, and the middle movable interlayer can be opened as ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com