Plugging construction method of reserved opening of basement soleplate and tower crane foundation and post-pouring zone reserved opening

A technology for basement floor and tower crane foundation, which is applied in infrastructure engineering, artificial islands, water conservancy projects, etc., can solve the problem that the basement floor and the opening of the tower crane foundation are blocked and other problems, and achieves good practicability and efficiency. Economic value, easy construction and operation, and the effect of a wide range of applications

Inactive Publication Date: 2010-06-23
广西建工第五建筑工程集团有限公司
View PDF0 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] With the development of urban construction, a large number of new buildings are becoming tall, large, and odd. During construction, tower cranes have been widely used, and most of the tower crane foundations fall within the scope of the proposed building, so the basement floor in the later stage The blockage of the reserved opening between the foundation of the tower crane is a construction problem often encountered by construction personnel, especially when the groundwater volume is large and the water pressure is high, the conventional dry hard concrete, fast hard concrete and other construction methods cannot be well Solve the problem of blocking the basement floor and the reserved opening of the foundation opening of the tower crane

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Plugging construction method of reserved opening of basement soleplate and tower crane foundation and post-pouring zone reserved opening
  • Plugging construction method of reserved opening of basement soleplate and tower crane foundation and post-pouring zone reserved opening
  • Plugging construction method of reserved opening of basement soleplate and tower crane foundation and post-pouring zone reserved opening

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0023] A plugging construction method for the reserved opening between the basement floor and tower crane foundation, which is suitable for the reserved opening between the basement floor and the tower crane foundation when the groundwater volume is large and the water pressure is high. 1 The method of plugging construction is to set up a water stop with a length consistent with the thickness of the basement floor 1 on the basis of draining the foundation, cleaning and pre-treating the reserved hole Sleeve 3, under the water-stop casing 3, install a stone-blocking concrete isolation layer 4, pave cobblestones 2 within a range of 1M around the water-stop casing 3 as a permeable layer, and lay steel wires on the pebble permeable layer 2 Mesh 21, and then put the submersible pump in the water-stop casing to continuously pump water, and pour concrete at the same time to seal the reserved opening until the concrete is poured and pounded 3 days later, the submersible pump stops pumpi...

Embodiment 2

[0034] The construction method of post-pouring tape reserved openings between basement floor plates is blocked. The basic principle and construction steps of this method are the same as those in Example 1. The installation of the water-stop casing is as follows: Figure 3 ~ Figure 4 shown.

[0035] The places where the construction preparation work should be paid special attention to before the plugging construction of the basement floor and the reserved opening of the tower crane foundation or the post-casting belt reserved opening between the basement floor by the method of the present invention are:

[0036] ①Material preparation: commercial concrete shall be used for pouring and pounding concrete at the reserved port, and the cement used to prepare plain cement slurry shall be of the same brand, same label, and same batch as the cement for pouring and pounding concrete.

[0037] ② Equipment preparation: 2 flat-plate vibrators (one of which is a spare), 3 plug-in vibrators ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a plugging construction method of a reserved opening of a basement soleplate and a tower crane foundation and a post-pouring zone reserved opening, which comprises the following steps of: on the basis of pumping out the water in a foundation and cleaning and preprocessing the reserved openings, arranging a water-stopping sleeve pipe of which the length conforms to the thickness of the basement soleplate at a position with larger water yield or at the position of a spring mouth, arranging a blocking-stone blocking-concrete isolated layer below the water-stopping sleeve pipe, fully laying cobblestones as a permeable layer within the range of 0.8-1.5m around the water-stopping sleeve pipe, horizontally laying a steel fabric sheet on the cobblestone permeable layer, then putting a diving pump into the water-stopping sleeve pipe to continuously pump the water, casting and compacting concrete to plug the reserved openings while pumping the water, and enabling the diving pump to stop pumping the water after the concrete is cast and compacted for 3 days; and after the final set of the concrete for plugging the reserved openings for 7 days, then rapidly taking out the diving pump, adopting a water-stopping sleeve pipe top closing assembly and pouring waterproof concrete to plug the pipe mouth of the water-stopping sleeve pipe. The method also can high-quality realize the plugging construction of the reserved opening of the basement soleplate and the tower crane foundation and the post-pouring zone reserved opening between the basement soleplates when the underground water quantity is large and the water pressure is high.

Description

Technical field: [0001] The invention relates to a building construction method, in particular to a construction method for plugging the basement floor of a high-rise building, the tower crane foundation and the reserved opening of the post-pouring belt Background technique: [0002] With the development of urban construction, a large number of new buildings are becoming tall, large, and odd. During construction, tower cranes have been widely used, and most of the tower crane foundations fall within the scope of the proposed building, so the basement floor in the later stage The blockage of the reserved opening between the foundation of the tower crane is a construction problem often encountered by construction personnel, especially when the groundwater volume is large and the water pressure is high, the conventional dry hard concrete, fast hard concrete and other construction methods cannot be well Solve the problem of blocking the basement floor and the reserved opening of...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D29/16
Inventor 侯立林冯锦华海涛卢继忠
Owner 广西建工第五建筑工程集团有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products