Plugging construction method of reserved opening of basement soleplate and tower crane foundation and post-pouring zone reserved opening
A technology for basement floor and tower crane foundation, which is applied in infrastructure engineering, artificial islands, water conservancy projects, etc., can solve the problem that the basement floor and the opening of the tower crane foundation are blocked and other problems, and achieves good practicability and efficiency. Economic value, easy construction and operation, and the effect of a wide range of applications
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] A plugging construction method for the reserved opening between the basement floor and tower crane foundation, which is suitable for the reserved opening between the basement floor and the tower crane foundation when the groundwater volume is large and the water pressure is high. 1 The method of plugging construction is to set up a water stop with a length consistent with the thickness of the basement floor 1 on the basis of draining the foundation, cleaning and pre-treating the reserved hole Sleeve 3, under the water-stop casing 3, install a stone-blocking concrete isolation layer 4, pave cobblestones 2 within a range of 1M around the water-stop casing 3 as a permeable layer, and lay steel wires on the pebble permeable layer 2 Mesh 21, and then put the submersible pump in the water-stop casing to continuously pump water, and pour concrete at the same time to seal the reserved opening until the concrete is poured and pounded 3 days later, the submersible pump stops pumpi...
Embodiment 2
[0034] The construction method of post-pouring tape reserved openings between basement floor plates is blocked. The basic principle and construction steps of this method are the same as those in Example 1. The installation of the water-stop casing is as follows: Figure 3 ~ Figure 4 shown.
[0035] The places where the construction preparation work should be paid special attention to before the plugging construction of the basement floor and the reserved opening of the tower crane foundation or the post-casting belt reserved opening between the basement floor by the method of the present invention are:
[0036] ①Material preparation: commercial concrete shall be used for pouring and pounding concrete at the reserved port, and the cement used to prepare plain cement slurry shall be of the same brand, same label, and same batch as the cement for pouring and pounding concrete.
[0037] ② Equipment preparation: 2 flat-plate vibrators (one of which is a spare), 3 plug-in vibrators ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com