Large-section loess tunnel construction method
A technology for loess tunnels and construction methods, applied in tunnels, earthwork drilling, mining equipment, etc., can solve problems such as complex construction, high cost, and slow progress, and achieve stable initial support, small disturbance of surrounding rock, and reliable engineering quality Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0021] Example: see figure 1 , the present invention firstly divides the entire section into four parts: the upper part 1, the middle part, the lower part and the bottom part, wherein the middle part is further divided into the middle left area 2, the middle right area 4 and the middle middle area 6, and the lower part is also divided into the lower left area 3. For the lower right area 5 and the lower middle area 7, the four parts are excavated by step method. During the excavation, the upper part 1 is ahead of the middle part by 3~5m, the middle part is ahead of the bottom part by 3~5m, and the bottom part is ahead of the bottom 8. The length is 10m, and excavation is carried out step by step, and the steps are as follows for each part:
[0022] The first step: Excavation of the upper part 1 ring, ballasting and initial support of the upper part 1:
[0023] First, carry out advanced support for the upper part 1 area, and then use the arc-shaped pilot pit method to excavate ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com