Blast construction method for penetrating complex building group by submarine tunnel at land region section
A subsea tunnel and construction method technology, which is applied in the direction of blasting barrels, explosive charges, offensive equipment, etc., can solve the problems of not determining the number of blasting times and the maximum charge amount of each section.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0026] The blasting construction method for subsea tunnels passing through complex building groups in the land area includes the following process sequence:
[0027] The first step is to test and determine the geological coefficient K and vibration attenuation index a of the rock mass in the construction project section;
[0028] The second step is to determine the vibration monitoring plan after selecting different targets on the ground above the tunnel, and obtain the vibration velocity law curve of the targets through monitoring;
[0029] The third step is to conduct a blasting vibration test before blasting, and use multiple vibration monitors to collect data, use software regression to calculate and correct K and α in the blasting site, and use the following formula to calculate the maximum section charge:
[0030] V = 1 N K ( Q 1 ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com