Tendency progressive outburst elimination roadway arrangement method

A technology of roadway layout and inclination, applied in safety devices, earthwork drilling, gas discharge, etc., can solve the problems of production delay of working face, reduction of effective protection range, and increase of outburst prevention works.

Inactive Publication Date: 2018-08-14
LIUPANSHUI NORMAL UNIV
View PDF0 Cites 12 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, in the implementation of protective layer mining (taking Shengyuan Coal Mine as an example), the coal pillars between the working faces are generally 15-20m. outburst prevention works
For the outburst coal seams mined without protective layers, the pre-extraction of the working face strips is carried out by excavating the floor rock gas drainage roadway. It is not easy to select the rock layer of the layer drilling, and sometimes it is necessary to drill along the bedding for supplementary extraction after drilling through the layer, which directly affects the excavation speed of the transportation and return air entry of the working face, resulting in the production delay of the working face
In the process of mining outburst coal seams, the traditional U-shaped ventilation method of the working face has exceeded the limit of gas in the upper corner, which affects the safe production of the working face

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Tendency progressive outburst elimination roadway arrangement method
  • Tendency progressive outburst elimination roadway arrangement method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0019] Such as figure 1 As shown, a method for arranging roadways with a tendency to progressively eliminate outbursts of the present invention includes the following steps:

[0020] a. After the mining of the working face in the upper section is completed, when the overlying strata of the goaf (1) is basically stable, a 2-5m coal pillar (2) or no coal pillar (2) is left along the edge of the goaf (1) 2) Excavate the return air level entry (3) in this section, and carry out at least two regional verifications every 10-15m during the excavation period.

[0021] b. Parallel bedding boreholes (7) are arranged along the strike in the return air entryway (3) and connected with the extraction pipeline to extract gas from the coal seam in a certain lower area. Among them, the sealing length of the bedding holes (7) is 8m-10m, the row spacing between the bedding holes (7) is 2m-4m, the diameter of the bedding holes (7) is 75mm-110mm, and the bedding drilling (7) The length is 60m to...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a tendency progressive outburst elimination roadway arrangement method, 2-5m of coal pillar or no coal pillar is reserved along a gob edge of an upper section, an air return level of the upper section is excavated; bedding drill holes are formed in the air return level to perform gas extraction on a certain area coal seam on the lower portion; after removing outburst hazards, a middle roadway is excavated; bedding drill holes are formed in the middle roadway to perform the gas extraction on a certain area coal seam on the lower portion; after removing the outburst hazards, a haulage way of the section is excavated, open-off cut communicates with the middle roadway and the air return level to form a working face to perform backstopping; and the steps above are repeated until mining of the coal seams of all the sections is completed. The tendency progressive outburst elimination roadway arrangement method has the beneficial effects that by using the gob-side entrydriving technology of the no coal pillar or narrow coal pillar and combining with the middle roadway of the working face, the purpose of effective control cover coal and gas outburst can be achieved,coal and gas outburst prevention work amount is reduced, the effective tilting length of outburst elimination of the working face is ensured, and safe and high efficient production of the working face is realized.

Description

technical field [0001] The invention relates to the fields of coal mining and gas drainage. In particular, it is a method for layout of outburst-reducing roadways with progressive inclines, which is suitable for the mining of protective layers in outburst coal seams. Background technique [0002] Most outburst mines in my country have low coal seam permeability and difficult gas extraction. With the increase of mining depth, coal tunnel outburst dynamic phenomenon occurs from time to time, which affects the tunneling speed of coal tunnel. The danger of coal and gas outburst has seriously restricted the safety production of coal mines. [0003] "Coal Mine Safety Regulations" and "Regulations on Prevention and Control of Coal and Gas Outburst" stipulate that for outburst coal seams, the principle of regional outburst prevention measures must be taken first, that is, the mining of protective layers and pre-pumping of coal seam gas. At present, in the implementation of protecti...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21F7/00E21C41/18
CPCE21F7/00E21C41/18
Inventor 苏静陈才贤杨军伟
Owner LIUPANSHUI NORMAL UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products