Method for treating uneven settlement of building
A treatment method and building technology, applied in construction, soil protection, infrastructure engineering, etc., can solve problems such as unevenness of buildings, and achieve the effect of controllable construction speed and simple construction quality control procedures
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0058] Example 1: Podium of a certain building in a certain city
[0059] A large amount of groundwater was lost due to the construction of nearby projects, which caused the settlement of the foundation of the podium. According to the monitoring data, the settlement on the east side of the podium of the building has exceeded the control value of 30mm, the maximum settlement value on the east side is 96.4mm, and the settlement on the west side is relatively small, with a maximum value of 22.2mm. See the distribution for the settlement value Figure 5 shown. Obvious cracking and deformation appeared at the settlement joints of the podium.
[0060] The foundation of the skirt building is in the form of artificially dug hole piles, the pile length is 6-10 meters, and the foundation of the main building is 22m deep artificially dug hole piles, with pile diameters of 1m and 1.2m. In order to slow down the sinking of the podium, we use dynamic tracking grouting for the bearing la...
Embodiment 2
[0061] Example 2: Podium of a certain building in a certain city
[0062] A large amount of groundwater was lost due to nearby engineering construction, causing the foundation of the building to settle. According to the current monitoring data, the maximum settlement of the podium of the building has exceeded the control value of 30mm, the maximum settlement value on the south side is 75.0mm, and the settlement on the north side is relatively small, with a maximum value of 20.9mm. See the distribution for the settlement value Figure 6 shown. The land subsidence around the building is more obvious.
[0063] The foundation of the building is in the form of hammered cast-in-situ piles, the pile length is 30 meters, and the pile diameter is 1m. We use dynamic tracking grouting for the bearing layer of the pile foundation for the foundation, and use grouting to compensate for the uneven settlement of the bearing layer due to water loss to protect the building. Finally, the un...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com