A technology for long rails and units, which is applied to tracks, track laying, track maintenance, etc., can solve the problems of difficulty in crew training, high failure rate of hydraulic systems, and inability to guarantee rail safety, so as to improve the efficiency of ballastless laying operations. , Convenience freight transportation, avoid the effect of on-line over-track transportation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0065] Regarding the track laying of ballasted ballast bed, as attached figure 1 shown.
[0066] The track laying unit is organized in sequence in the track laying direction: long rail tractor 1, main engine 2, auxiliary machine 3, sleeper transport wagon group 6 carrying sleeper truck 4, and locomotive 7.
[0067] Construction is carried out as follows:
[0068] 1. Preparation
[0069] (1) The long rail tractor 1 enters the track laying site ahead of time; the main engine 2 and auxiliary engine 3 are pushed by the locomotive 7 to the place where the line is to be laid, stop at a distance of about 0.5m from the end of the laid track, connect the pipeline of the unit, and start the engine. Build pressure in the hydraulic system and close the gears of the bogie drive mechanism;
[0070] (2) Put the crawler traction device 13 at the front end on the ballast with the truck-mounted crane 12 that comes with the main engine 2; make the main engine 2 ride on the crawler traction de...
Embodiment 2
[0091] Regarding the track laying of ballastless ballast bed, as attached figure 2 shown.
[0092] Construction is carried out as follows:
[0093] The track laying units are grouped sequentially in the track laying direction: ballastless track laying device 5, main engine 2, auxiliary machine 3, sleeper transport wagon set 6, locomotive 7.
[0094] (1) Hoist the crawler traction device 13 to the main engine 2 with the locomotive crane 12, so that the bogie 17 at the front end of the main engine 2 is supported on the laid rail. Stop at 0.5m away from the laid steel rail;
[0095] (2) Preset a ground roller 8 every 10m on the bearing groove of the ballastless ballast bed;
[0096](3) The long rail is pulled out from the sleeper rail transport wagon group 4 by the hoisting device 11 on the main engine 2, and separated to both sides of the car body through the rail splitting device, and enters the rail pushing mechanism 20;
[0097] (4) The rail pushing mechanism 20 drives t...