A method for crack arrest of ductile fracture of natural gas pipeline
A natural gas pipeline and ductile fracture technology, which is applied in the field of natural gas pipeline ductile fracture arrest, can solve the problems of not being widely used worldwide, increasing on-site connection operations, and lack of technology and experience in the application of crack arresting rings, so as to reduce construction procedures , Improve safety and reliability, improve the effect of crack arrest ability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0012] For the natural gas transmission pipeline with a pressure of 10MPa and an outer diameter of φ1016, the design factor of 0.72 is adopted, and the normal pipeline design adopts X100 steel pipe with a thickness of 10.2mm. In order to ensure or improve the crack arrest performance of the pipeline, every 50 X100 pipes (each steel pipe is about 12 meters long) are connected with 2 X70 steel pipes with the same outer diameter, and the wall thickness is 14.6mm. For X100 pipeline steel pipes, excessive toughness is not proposed, if the Charpy impact energy is required to be greater than or equal to 120J. For the toughness of two X70 steel pipes, according to the Battelle hyperbolic method recommended by ISO 3183: 2007 "Petroleum and Natural Gas Industry-Steel Pipes for Pipeline Transmission Systems" or API Spec 5L: 2007 (44th Edition) "Pipeline Steel Pipe Specifications", taking into account all Based on the database results of physical blasting experiments, and taking into acco...
Embodiment 2
[0014] For natural gas pipelines with a pressure of 12MPa and an outer diameter of φ1219, the design factor of 0.72 is used, and the normal pipeline design uses X120 steel pipes with a thickness of 12.2mm. In order to ensure or improve the crack arrest ability of the pipeline, every 80 X120 pipes (each steel pipe is about 12 meters long) are connected with 3 X80 steel pipes with the same outer diameter, and the wall thickness is 18.4mm. For X120 pipeline steel pipe, the Charpy impact energy is required to be greater than or equal to 150J. For the toughness of the three X80 steel pipes, according to the Battelle hyperbolic method recommended by ISO3183: 2007 "Petroleum and Natural Gas Industry-Steel Pipes for Pipeline Transmission Systems" and API Spec 5L: 2007 (44th Edition) "Pipeline Steel Pipe Specifications", taking into account the full size Based on the database results of physical blasting experiments, and taking into account the influence of gaseous conditions and other...
PUM
Property | Measurement | Unit |
---|---|---|
Wall thickness | aaaaa | aaaaa |
Charpy impact energy | aaaaa | aaaaa |
Charpy impact energy | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com