Tensioning method for bonded and unbonded combination prestress concrete beams at post-cast strip

A bonded prestressed, non-bonded technology, used in bridges, bridge construction, erection/assembly of bridges, etc., can solve the problem of high quality and performance requirements of tension end anchorage, insufficient strength, prestressed problems such as large losses, to achieve the effect of shortening the construction period, meeting the design requirements, and reducing the disturbance

Active Publication Date: 2014-09-17
CHINA FIRST METALLURGICAL GROUP
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] 1. Due to the friction in the bellows of the bonded prestressed steel strands (the friction between the steel strands, the friction between the steel strands and the pipe wall, the friction between the steel strands and the bellows), the prestressed large loss;
[0004] 2. The bonded prestressing effect is better, but the stress loss is larger with time;
[0005] 3. Although the unbonded prestressed steel strand has a protective cover and less prestress loss, this technology has higher requirements on the quality and performance of the anchorage at the tension end;
[0006] 4. The unbonded prestressed steel strand can slide due to the protection of the sheath, and its strength cannot fully play its role in the beam

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Tensioning method for bonded and unbonded combination prestress concrete beams at post-cast strip
  • Tensioning method for bonded and unbonded combination prestress concrete beams at post-cast strip
  • Tensioning method for bonded and unbonded combination prestress concrete beams at post-cast strip

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] Such as Figure 1-5 As shown, the stretching method of bonded and unbonded composite prestressed concrete beams at the post-casting zone includes the following steps:

[0026] 1) When the steel bars of the frame beam 7 below the floor 6 of the building are bound, an unbonded prestressed steel hinge line fixing bracket and a bonded prestressed steel hinge are arranged in the same frame beam 7 perpendicular to the post-casting belt 3 A wire fixing bracket, an unbonded prestressed steel hinge wire 1 is arranged on the unbonded prestressed steel hinge wire fixing bracket, and a bonded prestressed steel hinge wire 2 is arranged on the bonded prestressed steel hinge wire fixing bracket;

[0027] One end of the bonded prestressed steel hinge line 2 is set at the haunched concrete 10 on both sides of the frame beam 7 below the floor 6, and one end of the unbonded prestressed steel hinge line 1 is fixed on the floor 6, with bonded prestressed The other ends of the steel hinge l...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a tensioning method for bonded and unbonded combination prestress concrete beams at a post-cast strip, which is characterized by including the following steps of 1) setting one ends of bonded prestress stranded steel wires at haunching concrete positions on two sides of a frame beam below a floor slab, fixing one ends of unbonded prestress stranded steel wires on the upper side of the floor slab, and fixing the other ends of the bonded prestress stranded steel wires and the unbonded prestress stranded steel wires to a side post or a side beam of a building; 2) casting concrete and the haunching concrete to the frame beam and then casting the concrete of the floor slab; and 3) tensioning the unbonded prestress stranded steel wires on the floor slab firstly when the design strength of the frame beam and the floor slab reaches 75%, and then tensioning the bonded prestress stranded steel wire below the floor slab. By the tensioning method, construction period can be shortened, loss of prestress of prestress concrete members can be reduced and the respective advantages of the bonded prestress stranded steel wires and the unbonded prestress stranded steel wires can be developed.

Description

technical field [0001] The invention belongs to the technical field of tensioning of bonded and non-bonded combined prestressed concrete beams at the post-casting belt, and in particular relates to a tensioning method for combined prestressed concrete beams with bonding and non-bonding combined at the post-casting belt method. Background technique [0002] The use of new materials and new technologies is vigorously promoted by the state in the construction industry. The energy-saving (steel-saving and cement-saving) design of buildings is being vigorously promoted. The large-span prestressed structural form has been widely used in various building structures and has become a modern The direction of design research and construction technology research has been gradually promoted and applied. However, in actual engineering use, a single bonded or unbonded prestressed structure is used. Although a certain design effect has been achieved, the single prestressed structure has th...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E04G21/12E01D21/00
Inventor 王平杨建新刘明周韩刚平
Owner CHINA FIRST METALLURGICAL GROUP
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More