Unlock instant, AI-driven research and patent intelligence for your innovation.

Geological engineering drilling jig and oil delivery control method thereof

An engineering drilling rig and geological technology, applied to drilling equipment and methods, rotary drilling rigs, drilling equipment, etc., can solve the problems of inaccurate control, serious oil leakage, no stepless speed regulation, etc., and achieve simple and accurate operation, leakage Low oil failure rate and improved reliability

Inactive Publication Date: 2014-02-12
ANHUI LIANGHUAI KELI MACHINERY MFG
View PDF9 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] There are three ways to control the speed of geological engineering drilling rigs: 1. Mechanical control, which is composed of a gear transmission box and a clutch. The gear transmits kinetic energy to drive the grinding disc and then drive the drill pipe to achieve drilling. 2. Hydraulic valve control. The hydraulic system consists of pumps, valves, oil cylinders, motors and fuel tanks. The speed of the actuator is controlled by the hydraulic valve. The disadvantage of this method is that the oil leakage is serious and the handle is controlled. 3. Pilot hydraulic control, the hydraulic system is divided into two parts, the main circuit and the pilot circuit, the pilot oil is controlled by the handle valve, and then the pilot oil controls the main hydraulic valve. The disadvantage of this method is that the oil circuit is complicated and installation Time-consuming and laborious to disassemble

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Geological engineering drilling jig and oil delivery control method thereof
  • Geological engineering drilling jig and oil delivery control method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0050] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

[0051] see figure 1 , the geological engineering drilling rig includes an oil pump (not shown in the figure), a handle 10 for controlling the oil output of the oil pump, a handle mechanism 20, a potentiometer 30, a first photoelectric switch 40, a second photoelectric switch 50, and a control module 60 , a first electromagnet 70, a second electromagnet 71, an electromagnetic reversing valve 72 and a variable displacement pump regulating electromagnet 73.

[0052] The handle mechanical device 20 includes a fixed body 21, a moving body 22, a connecting body 23 and an arc track 24. One end of the con...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a geological engineering drilling jig and an oil delivery control method thereof. The geological engineering drilling jig comprises an oil delivery pump, a handgrip, a handgrip mechanical device, a potentiometer, a first photoelectric switch, a second photoelectric switch, a control module, a first electromagnet, a second electromagnet, an electromagnetic reversing valve and a variable adjusting electromagnet. The geological engineering drilling jig and the oil delivery control method have the advantages that 1, a circuit of the control module is modularly design and convenient in dismounting, aviation plugs for plug-in are adopted for realize all connection, and accordingly assembly is convenient; 2, remote control is realized due to an electro-hydraulic integrated design, and personnel do not need to work in a field; 3, a circuit system is proportionally controlled, operation is simple, convenient and precise, and a hydraulic handle does not need to be pulled manually; and 4, the structure is simplified, most oil tubes are omitted, accordingly, oil leakage failure rate is low, and reliability is greatly improved.

Description

technical field [0001] The invention relates to a geological engineering drilling rig, in particular to a control part of a multifunctional handle of the geological engineering drilling rig and a corresponding oil delivery control method of the geological engineering drilling rig. Background technique [0002] There are three ways to control the speed of geological engineering drilling rigs: 1. Mechanical control, which is composed of a gear transmission box and a clutch. The gear transmits kinetic energy to drive the grinding disc and then drives the drill pipe to achieve drilling. 2. Hydraulic valve control. The hydraulic system consists of pumps, valves, cylinders, motors and fuel tanks. The speed of the actuator is controlled by the hydraulic valve. The disadvantage of this method is that the oil leakage is serious and the handle is controlled. 3. Pilot hydraulic control, the hydraulic system is divided into two parts, the main circuit and the pilot circuit, the pilot oi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21B3/00
Inventor 陆德义张德民侯洁明曹培
Owner ANHUI LIANGHUAI KELI MACHINERY MFG