Unlock instant, AI-driven research and patent intelligence for your innovation.

Double-cantilever hard rock coal roadway heading and anchoring device

A double-cantilever, hard-rock technology, which is applied to shaft equipment, bolt installation, mining equipment, etc., can solve problems such as longer anchorage time, longer empty head distance, and potential safety hazards, so as to improve safety operation coefficient, improve tunneling efficiency, Guarantee the effect of safe production

Active Publication Date: 2014-07-16
CHINA RAILWAY ENGINEERING EQUIPMENT GROUP CO LTD
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002]Most of the current coal mine roadway driving equipment and anchoring equipment are operated independently and separately. Even if there is a certain degree of combination, due to the space position requirements between The inevitable contradictions above, and can not maximize their respective best performance, the disadvantages are:
[0003]1. After a certain progress in tunneling, the roadheader must exit and allow the bolter to enter for anchoring work. After the anchoring work is completed, the roadheader can enter the next One round of excavation, or the excavation machine must stop after excavating for a certain distance, and then continue to excavate until the anchoring work is completed. This operation method seriously affects the excavation efficiency
[0004]2. The roadheader generally digs a body length and exits before allowing the bolter to enter for anchoring operations, resulting in longer empty head distance, especially in geological conditions In the worst case, it increases the danger of the workers, which is not conducive to safe production
[0005]3. Most of the current coal mine tunneling equipment is single-cantilever design, and the tunneling efficiency is relatively low
[0006]4. The effect of ventilation and dust reduction is not satisfactory, and the amount of dust is large, which is not conducive to the health of workers
[0007]5. The operation method of the rock bolter is not flexible enough, resulting in longer anchoring time and lower anchoring efficiency
[0008]6. The operators do not have certain protective measures during the operation, which poses a relatively large safety hazard
[0009]7. The transportation and lifting of the mesh mostly rely on manpower, and the labor intensity of the operators is relatively high

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Double-cantilever hard rock coal roadway heading and anchoring device
  • Double-cantilever hard rock coal roadway heading and anchoring device
  • Double-cantilever hard rock coal roadway heading and anchoring device

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0030] A double-cantilever bolt-digging equipment for hard rock coal roadway, see Figure 1-Figure 3 , including a coal handling device, a hydraulic system, an electrical control system, a dust removal system, a power system, a head frame, a cantilever cutting device connected to the front end of the head frame, a crawler belt traveling device 14 below the head frame and hinged to the head frame The support platform 10 at the rear end is provided with a temporary support device on the upper end of the machine head frame, and a roof bolt drill 6 and a side wall bolt drill 9 are arranged on the support platform, and a mesh is also provided on the support platform Transport trolley 7.

[0031] The cutting device is composed of double cantilever 2 and double cutting heads 1. The double cantilever cutting heads are distributed along the center line. The two cutting heads 1 move in parallel to cut the rock (coal) layer on their respective half sides. They can move synchronously and ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

A double-cantilever bolting equipment for hard rock coal roadway, including a coal transport device, a hydraulic system, an electrical control system, a dust removal system, a power system, a head frame, and a cantilever cutting device connected to the front end of the head frame. The crawler walking device and the support platform hinged at the rear end of the head frame are provided with a temporary support device at the upper end of the head frame, and a roof bolt rig and a side wall bolt rig are arranged on the support platform. There is also a mesh transport trolley on the platform. The double-cantilever bolt-digging equipment for hard rock coal roadway of the present invention not only adopts the design of double-cantilever and double-cutting heads, but also organically combines the tunneling system and the anchoring system for operation, which greatly improves the tunneling efficiency. The temporary support has retractable temporary support plates and finger shields, which greatly shorten the empty head distance during the excavation process, improve the safety factor of operators, and ensure safe production.

Description

technical field [0001] The invention relates to a driving equipment, in particular to a double-cantilever bolt-digging equipment for hard rock coal roadway. Background technique [0002] Most of the current coal mine roadway excavation equipment and anchoring equipment are operated independently. Even if there is a certain degree of combination, due to the inevitable contradiction between the space position requirements between the excavation and anchoring, it is impossible to maximize their respective functions. The best performance, its disadvantages are: [0003] 1. After a certain progress in the tunneling, the roadheader must withdraw and let the bolter enter for anchoring work. After the anchoring work is completed, the roadheader can enter the next round of tunneling, or the roadheader must stop after tunneling for a certain distance , Waiting for the anchoring operation to be completed before continuing to excavate forward, this operation method has seriously affect...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21C25/06E21C29/22E21C25/68E21D20/00E21D11/40E21D19/00
Inventor 王锴李建斌韩亚丽赵华张宁川张国良宋丹
Owner CHINA RAILWAY ENGINEERING EQUIPMENT GROUP CO LTD