Steel structure frame type tower crane base

A steel structure frame and tower crane technology, applied in infrastructure engineering, construction, etc., can solve the problems of large compartment area, heavy foundation, and no safety barrier, etc., and achieve the effect of low transportation cost, long service life and novel structure

Active Publication Date: 2014-11-05
山东冠华建设工程有限公司
View PDF14 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002]At present, the tower cranes produced by all tower crane manufacturers in China are not equipped with tower crane foundations when they leave the factory. The main reason is that the overall fixed foundation is too heavy and not suitable for Transportation, split-type combined foundation technology is immature, not as safe as fixed cast-in-place foundation, manufacturers always follow the tower crane with a fixed foundation pouring drawing, and the buyer and user use on-site cast-in-place concrete prefabrication, on-site prefabrication Although the foundations are safe and reliable, they are more than tens of tons and are not suitable for hoisting, transportation and reuse. In the future, each time the tower crane is installed and disassembled, the foundation needs to be prefabricated. The production process consumes manpower and material resources.
In order to solve the above problems, in recent years, many people have designed and produced several combined foundations, which have been tried in some areas. The combined foundation has been popularized and used in some areas because of its characteristics of being disassembled and reused, and convenient for short-distance transportation. 具有代表性的有赵正义提交的的申请号(98101471.2、9810147.4、200610002190.6、200610067145.9、201110146469.2、201120183188.x)和丛卫民提交的申请号(200420080405.2、200510038753.2、201110129155.1)以上在不断的创新和改进中,逐渐 It is recognized by people. Their main advantage is that the foundation with an overall weight of more than 40 tons can be disassembled and divided into several pieces, which are suitable for short-distance hoisting and transportation to another place for combined installation and reuse, avoiding the great waste of one-time foundations. In contrast, it saves a certain amount of concrete and steel reinforcement resources, but its technology still has deficiencies, and there are many safety hazards. In general, its structure has the following problems: (1) The structure of single bolt connection is unreasonable, easy to Corrosion is not easy to replace, the pre-tightening force of the connection cannot be achieved, and the single connection method of steel strands is not safe enough, there is no insurance barrier, the steel strands will relax under long-term working conditions, and the anchors tend to spin out when they are reused (2) Due to the excessive pursuit of reducing the ground bearing capacity of the modeling structure, the shear force and bending moment carried by the end surface of the foundation are ignored, the total thickness of the structure and the main force-bearing cross-sectional area of ​​the upper end surface are too small, And the weight of the structure is too light, because the weight of the foundation is directly proportional to the overturning force, which requires a large amount of ballast, bulk materials or buried disposal, which increases the cost of use; (3) The structure of the shear parts is unreasonable, and The pre-embedded steel bars are welded together, and the weld joints are only pre-embedded in concrete at a depth of 1cm. The shear-resistant structural parts are too small and too simple. It is found that it is not easy to repair, has low reliability, and has potential safety hazards; (4) There are many reserved bolt holes on the main force-bearing structure, which reduces the load-bearing performance and service life of the structure; (5) Because of its special structural shape, A large number of special molds are required in the production process, which is not suitable for the needs of scattered small groups of customers. The small group of customers with tower cranes in China is widely distributed, so that the total proportion is quite large, which affects the penetration rate; (6) Structure The shape of the design is not convenient enough for transportation, it takes up too much space in the compartment, and it takes up too much space for storage. The basic weight of the whole machine is more than 20 to 30 tons, and the cost of long-distance supply is high or even several times higher than the cost price; (7 ) There are weaknesses in the structural modeling, and the expansion angles and corners of the foundation are easy to be damaged during repeated disassembly and transportation, which seriously affects the number of uses; (8) Since the horizontal error of the standard section base is required to be within 2mm when installing the tower crane, This means that the tower crane must have extremely strict requirements on its foundation, and there must be no mistakes, and the horizontal error may exceed 2mm. There may be safety accidents. From the perspective of safety, a comprehensive analysis of the structure of the prefabricated and assembled tower crane foundation of the existing technology has certain hidden safety hazards. The service life cannot be as suitable for long-term strategies as railways and highway bridges, which affects Return on investment, affecting resource savings
[0003] On July 20, 2011, the applicant applied to the State Administration of China for a utility model patent for a series-connected tower crane foundation, which has a main concrete foundation, The center line of the main concrete foundation is connected in series with the transition foundation unit and the end foundation unit. The adjacent contact surfaces of the main concrete foundation, the transition foundation unit and the end foundation unit are respectively provided with positioning devices. The main concrete foundation, the transition foundation unit and the The end foundation unit is positioned and connected by the positioning device, the end foundation unit, the transition foundation unit and the main concrete foundation are horizontally provided with zipper reserved holes, and the end foundation unit, the transition foundation unit and the main concrete foundation pass through the zipper pre-set The reserved holes are fixedly connected. The end foundation unit and the transition foundation unit are respectively provided with reserved holes for anchor bolts. It is connected with the bottom beam pressure plate of the tower crane. The disadvantages are: 1. During repeated disassembly and transportation, the corners and positioning devices of the foundation are easy to be cracked and damaged, which seriously affects the stability of the tower crane. 2. The foundation at the end There are reserved holes for anchor bolts on the unit and the transitional basic unit, which greatly reduces the shear force and bearing capacity of the basic unit, which may easily lead to the breakage of the basic unit and cause accidents, and the replacement of the anchor bolts is time-consuming and laborious. 3 1. A large number of special molds are required for the current production, which is not suitable for small groups of customers. For example, when supplying customers at a long distance, the entire foundation occupies too much space in the carriage, and the total weight is too heavy, resulting in high transportation costs.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Steel structure frame type tower crane base
  • Steel structure frame type tower crane base
  • Steel structure frame type tower crane base

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0028] Embodiment one, as attached figure 1 As shown, the specific steps of the manufacturing process of a steel structure frame tower crane foundation are as follows:

[0029] 1. Material preparation: according to the bearing capacity of the tower crane foundation, cut and blank four horizontal metal ribs 8, four vertical metal ribs 9 and four vertical metal ribs 10 in the main concrete foundation unit 1, and four transitional concrete foundations according to the drawing Sixteen horizontal metal ribs 8, sixteen vertical metal ribs 9 and sixteen vertical metal ribs 10 in unit 2, sixteen horizontal metal ribs 8, sixteen vertical metal ribs in four end concrete foundation units 3 Metal ribs 9 and sixteen vertical metal ribs 10, the horizontal metal ribs 8, vertical metal ribs 9 and vertical metal ribs 10 in the main concrete foundation unit 1, the transition concrete foundation unit 2 and the end concrete foundation unit 3 can be used under the angle steel material, then resp...

Embodiment 2

[0031] Embodiment two, as attached figure 2 As shown, the specific steps of the manufacturing process of a steel structure frame tower crane foundation are as follows:

[0032] 1. Material preparation: according to the bearing capacity of the tower crane foundation, cut and blank four horizontal metal ribs 8, four vertical metal ribs 9 and four vertical metal ribs 10 in the main concrete foundation unit 1, and four transitional concrete foundations according to the drawing Sixteen horizontal metal ribs 8, sixteen vertical metal ribs 9 and sixteen vertical metal ribs 10 in unit 2, sixteen horizontal metal ribs 8, sixteen vertical metal ribs in four end concrete foundation units 3 Metal ribs 9 and sixteen vertical metal ribs 10, the horizontal metal ribs 8, vertical metal ribs 9 and vertical metal ribs 10 in the main concrete foundation unit 1, the transition concrete foundation unit 2 and the end concrete foundation unit 3 can be selected from angle steel, Flat iron, threaded...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical field of tower crane devices and particularly relates to a steel structure frame type tower crane base. The tower crane base comprises a main concrete base unit, a transition concrete base unit, an end portion concrete base unit and a prestress steel strand connection device. The tower crane base is characterized in that outer frames of the main concrete base unit, the transition concrete base unit and the end portion concrete base unit are provided with steel structure frames respectively, and cross metal ribs, longitudinal metal ribs and vertical metal ribs are mutually intersected and fixedly connected to form steel structure frames. The problems that the main concrete base unit, the transition concrete base unit and the end portion concrete base unit require special dies during concrete pouring, a lot of dies are required to be produced, the occupied cargo area is large during conveying, the total weight is high and the conveying fee is high caused by large bearing force during long-distance conveying are solved, and the tower crane base has the advantages of being novel in structure, high in safety performance and convenient to disassemble and convey.

Description

technical field [0001] The invention relates to the technical field of tower crane equipment, in particular to a steel structure frame tower crane foundation. Background technique [0002] At present, the tower cranes produced by all tower crane manufacturers in my country are not equipped with tower crane foundations when they leave the factory. The pouring foundation is safe, and the manufacturers follow the tower crane with a copy of the fixed foundation pouring drawing, which is prefabricated by the purchaser and user using on-site cast-in-place concrete. Although the on-site prefabricated foundation is safe and reliable, it is not suitable for hoisting if it weighs more than tens of tons The transportation is reused, and the foundation needs to be prefabricated every time the tower crane is installed and disassembled. The manufacturing process consumes manpower and material resources, and the prefabricated foundation is heavy and needs to be dug and buried. In order to s...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D27/42E02D27/44
Inventor 相起兵
Owner 山东冠华建设工程有限公司