A vacuum heat treatment and high-alloy steel technology, applied in heat treatment equipment, heat treatment process control, manufacturing tools, etc., can solve the problems of slow heating speed, prolonged holding time, difficult heat treatment process parameters, etc., and achieve small quenching stress and high red hardness , Reduce the effect of heat treatment distortion
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0016] Set the final heating temperature of SKD61 to 1030°C, and the total holding time in the high temperature zone is 110min, then:
[0017] (1) The first-stage heating temperature and first-stage holding time parameters in the high-temperature zone are set as follows:
[0018] Heating temperature: 980°C
[0019] Holding time: total holding time in high temperature zone × 80%, that is, 110min × 80% = 88min.
[0020] (2) The parameters of the second stage heating temperature and the second stage holding time in the high temperature zone are set as follows:
[0021] Heating temperature: 1030°C
[0022] Holding time: total holding time in high temperature zone × 15%, that is, 110min × 15% = 16.5min.
[0023] (3) Setting of heating time parameters between the first stage in the high temperature zone and the second stage in the high temperature zone:
[0024] The time required to raise the temperature from 980°C to 1030°C: the total holding time in the high temperature zone ×...
Embodiment 2
[0028] Set the final heating temperature of SKD61 to 1300°C, and the total holding time in the high temperature zone is 100min, then:
[0029] (1) The first-stage heating temperature and first-stage holding time parameters in the high-temperature zone are set as follows:
[0030] Heating temperature: 1000°C
[0031] Holding time: total holding time in high temperature zone × 80%, that is, 100min × 80% = 80min.
[0032] (2) The parameters of the second stage heating temperature and the second stage holding time in the high temperature zone are set as follows:
[0033] Heating temperature: 1300°C
[0034] Holding time: total holding time in high temperature zone × 15%, that is, 100min × 15% = 15min.
[0035] (3) Setting of heating time parameters between the first stage in the high temperature zone and the second stage in the high temperature zone:
[0036] The time required to raise the temperature from 1000°C to 1300°C: the total holding time in the high temperature zone ×...