Construction method of pipe pile leading hole under the geological condition of isolated stone group
A technology of geological conditions and construction methods, applied in drilling equipment and methods, earthwork drilling, drilling equipment, etc., can solve problems such as inability to penetrate rocks, increased construction costs, mud pollution, etc. Buried drilling phenomenon, the effect of low site requirements
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0009] The present invention will be further described below in conjunction with the accompanying drawings and embodiments, and the purpose is only to better understand the content of the present invention. Therefore, the examples given do not limit the protection scope of the present invention.
[0010] see figure 1 , the pipe pile lead hole construction method under the geological conditions of the boulder group described in the present embodiment is carried out according to the following steps:
[0011] ⑴ Measurement positioning:
[0012] Based on the coordinate measurement control point set by the owner in the field area as the benchmark, the center pile of each group of piles and the piles of any pile coaxial with the center pile are released one by one through coordinate conversion, rotation angle, distance measurement, and fixed point by using the range finder. The other pile positions of each group of piles are released one by one with a steel tape using the released...