Multilayer load bearing heat-insulated cantilever plate butted with frame structure and preparation and construction method
A frame structure and cantilever plate technology, applied in building components, building structures, building materials, etc., to achieve the effect of simplifying the construction process, reasonable structure and high efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045] It is used for the air conditioner external unit shelf on the right side of the balcony of a residential building. It is designed as a shelf for superiors, and three air-conditioning outdoor units are placed, with a maximum load of 350KG; the elevation of the cantilevered slab is flush with the floor slab in the architectural shape design, and some sections are connected to the frame columns.
[0046] Refer to attached figure 1 : The design elements of the cantilever slab are: the length of the cantilever slab is 1800mm, the width is 600mm, and the thickness is 120mm; 3 B05 grade autoclaved aerated concrete, the high-density layer 7 of the cantilever slab is 40mm thick and the density is 700 kg / m 3 B07 grade autoclaved aerated concrete; steel mesh is distributed inside the cantilever slab, and the side of the cantilever slab connected to the building is provided with an interface end 16. The threaded steel bars 9 at the interface end 16 are T12×6 screws with a spacing...
Embodiment 2
[0059] The implementation conditions and steps are the same as in Example 1, except that the autoclaved aerated concrete composite structure has a density of 300kg / m 3 B03 grade autoclaved aerated concrete with a density of 800 kg / m 3 The two-layer structure of B08 grade autoclaved aerated concrete; the cantilevered slab is hoisted to the position required by the design, and the formwork construction of the frame column and frame beam and the positioning and fixing of the cantilevered slab are completed; the frame column is poured first, and then the Pouring the frame beam, through the frame column and frame beam concrete pouring twice, the cantilever slab and the frame structure are connected together.
Embodiment 3
[0061] Implementation conditions and steps are the same as in Example 1, except that the autoclaved aerated concrete composite structure is a density of 400kg / m 3 B04 grade autoclaved aerated concrete with a density of 600 kg / m 3 The two-layer composite structure of B06 grade autoclaved aerated concrete; the perforated plate 15 is an M10 nut, which is welded on the fixed plate 14.