Construction method for sealing karst cave near trench wall of underground continuous wall in karst stratum

An underground diaphragm wall and construction method technology, applied in soil protection, infrastructure engineering, construction, etc., can solve the problems of polluting the surrounding environment, waste of mud and concrete for wall protection, insufficient theoretical basis for grouting ratio, etc., to improve safety. performance, improve construction efficiency and shorten construction time

Inactive Publication Date: 2013-12-11
CHINA RAILWAY 16 BUREAU GRP BEIJING METRO ENG CONSTR +1
View PDF7 Cites 20 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] In view of the deficiencies in the prior art, the purpose of the present invention is to provide a construction method for closing the karst caves near the groove wall of the underground diaphragm wall in the karst formation, so as to overcome the lack of theoretical basis for grouting ratio in the prior art, resulting in a large amount of mud and concrete for retaining walls Waste, polluting the surrounding environment and other major defects, and there are karst geological problems in the area near the underground diaphragm wall

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for sealing karst cave near trench wall of underground continuous wall in karst stratum
  • Construction method for sealing karst cave near trench wall of underground continuous wall in karst stratum
  • Construction method for sealing karst cave near trench wall of underground continuous wall in karst stratum

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] The present invention will be described in detail below in conjunction with specific embodiments. The following examples will help those skilled in the art to further understand the present invention, but do not limit the present invention in any form. It should be noted that those skilled in the art can make several modifications and improvements without departing from the concept of the present invention. These all belong to the protection scope of the present invention.

[0032] This embodiment provides a construction method for sealing karst caves near the groove wall of the underground diaphragm wall in karst strata, which is used in a site where a subway station is proposed to be built. The total length of the outsourcing of the station is 200m, the depth of the underground diaphragm wall is 12.5m, and the karst is fully developed in the area , the construction method of closed karst cave should be adopted to deal with the karst geology around the underground dia...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a construction method for sealing a karst cave near a trench wall of an underground continuous wall in a karst stratum, comprising the steps of firstly, surveying the situation of the karst cave; secondly, pumping and discharging karst water; thirdly, implementing primary filling in the karst cave; fourthly, implementing primary double-slurry grouting for reinforcement; fifthly, implementing secondary filling and secondary double-slurry grouting for reinforcement; sixthly, after completely implementing cement-sodium silicate double-slurry grouting and sealing the whole boundary, implementing compaction grouting by adopting cement slurry till reaching a technical standard of grouting stop; seventhly, after finishing grouting and pulling out a grouting pipe, sealing holes with cement mortar M7.5#, wherein the completion of hole sealing means the completion of sealing the karst cave on the periphery of the grouting holes; eighthly, inspecting a karst cave treatment effect. According to the construction method for sealing the karst cave near the trench wall of the underground continuous wall in the karst stratum, the cement slurry consumption can be lowered, the setting time of the cement-sodium silicate slurry is shortened, the construction efficiency is improved, the surrounding environment is protected, the strength of a grouted condensed slurry body is guaranteed, and the safe implementation of a project is assured.

Description

technical field [0001] The invention relates to a construction method in the technical field of construction engineering, in particular to a construction method for sealing a karst cave near the groove wall of an underground diaphragm wall in a karst formation. Background technique [0002] Generally, during the construction of the underground diaphragm wall, mud is needed to protect the wall to prevent the tank wall from collapsing. However, when the underground diaphragm wall is constructed in the limestone karst area, the retaining wall mud and concrete used for groove formation are often lost due to the existence of underground caves nearby. This not only causes a large amount of waste of engineering materials, but also affects the quality of the groove wall of the underground diaphragm wall. In order to make the bearing capacity and deformation of the underground diaphragm wall meet the requirements, the karst caverns around it must be closed and reinforced, and the fu...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D3/12E02D3/10
Inventor 朱小藻郭银波高宪民李辉沈水龙许烨霜曹依雯范志高周洪东刘锐李晓亮苏周勃孙国辉刘启政顾长明吴玮
Owner CHINA RAILWAY 16 BUREAU GRP BEIJING METRO ENG CONSTR
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products