Quality management and control method for electricity transaction data warehouses and management and control system thereof
A data warehouse and power transaction technology, applied in the fields of electrical digital data processing, data processing applications, special data processing applications, etc., can solve the control, verification rules and verification that cannot meet the free customization of business personnel and do not consider quality issues Logic solidification and other problems to achieve the effect of promoting subjective initiative, shortening processing time, and realizing tracking and assessment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0050] 1. Define the metadata information of the data item for the rationality verification of the data. Metadata information includes the settings of parameters such as "whether to allow null", "whether to allow zero", "maximum value", "minimum value", and "menu range". Define the metadata of the dataset, including parameters such as "data frequency" and "time format" for timeliness verification, and parameters for "dataset maintainer" for message release.
[0051] Table 1 Extended metadata definition of data item
[0052]
[0053] 2. Define the verification rules. Link dynamic query statements through operators. Provide a data warehouse model selector, based on the database table domain name technology, to realize the selection of data sets and data items. Provide operators and function selectors, operators include conventional mathematical operators, and functions provide common database syntax keywords, such as "summation (", "grouping (", etc. After the expression e...
example 1
[0054] Example 1: On-grid electricity of power plants. One piece of data every 15 minutes, one power plant should have 96 pieces of data in one day. The validation rules are expressed as:
[0055] HAVING(D.v1)=96
[0056] GROUP BY(to_char(D.t,'yyyymmdd'),D.p,D.a)
example 2
[0057] Example 2: The total amount of online electricity in each period is equal to the sum of the online electricity in each period.
[0058] D.v1=D.v2+D.v3+D.v4+D.v5
[0059] where D.t=:param and D.a='Gateway port power'
[0060] Explanation: D represents the data set, v1 represents the total power of the data item, v2 represents the peak power of the data item, v3 represents the peak power of the data item, v4 represents the average power of the data item, and v5 represents the valley power of the data item. The time primary key of the data set in the condition is passed in when the verification task is executed, and the application dimension primary key of the data set is "gateway port power".
[0061] 3. Define the timeliness time expression. Set the timeliness check time expression according to the fixed format. The format specification of the expression is as follows:
[0062] Table 2 Explanation of timeliness time format
[0063]
[0064] Examples of timeliness...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com