Large-area or large-volume concrete pre-buried blast hole arrangement method and blasting demolition method

A large-volume concrete, large-area technology, applied in blasting and other directions, can solve problems such as high cost and difficulty in drilling, and achieve the effects of reducing engineering costs, avoiding drilling operations, and facilitating blasting safety.

Active Publication Date: 2015-10-07
叶建军
View PDF6 Cites 16 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This approach has many disadvantages: due to the presence of steel bars (especially densely distributed stirrups) in the con

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Large-area or large-volume concrete pre-buried blast hole arrangement method and blasting demolition method
  • Large-area or large-volume concrete pre-buried blast hole arrangement method and blasting demolition method
  • Large-area or large-volume concrete pre-buried blast hole arrangement method and blasting demolition method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0056] Example 1: The concrete (with reinforcement) shear wall is 30m high, 15m long and 0.30m thick. Steel pipes with a diameter of 32 mm and a length of 15 m with notches on the outer wall are pre-buried on the center line of the horizontal section of the shear wall at every 1 m elevation and along the contour line along the length of the wall, and the uppermost pipe is 1 m away from the upper surface , the bottom one is flush with the ground, a total of 30 steel pipes. Both ends of each steel pipe are opened on the side of the concrete wall.

[0057] Utilize above-mentioned pre-embedded steel pipe to remove blasting hole as shear wall, construction procedure of the present invention is:

[0058] 1) Find the openings at both ends of the pre-buried blast hole, and clean the pipe with compressed air;

[0059] 2) Insert the rope from one end opening of the pre-buried blasthole to the other opening; then tie the discontinuous emulsified charge and detonating cord w...

Embodiment 2

[0061] Embodiment 2: The concrete dam has a top thickness of 6m, a bottom thickness of 50m, a height of 80m, and a length of 200m. Such as Figure 10 , Figure 11 As shown in the layout of the embedded blast hole (in this example, the number of embedded pipes forming a single channel is different from that in the schematic diagram), starting from the ground of the dam foundation, the cast iron pipes with notches on the outer wall are embedded every 1.2m (also used as concrete Cooling water pipe during construction), as a pre-buried blasthole, the inner diameter of the cast iron pipe is 40mm, the pipes are all in the horizontal plane, and the direction is perpendicular to the length of the dam. In the same horizontal plane, the pipes are parallel to each other, and the distance between the pipes is 1.8m. Six pre-embedded pipes on the same plane are connected to form a single passage, and the two ends of the passage are opened on the back water surface of the dam (the length o...

Embodiment 3

[0067] Embodiment 3: the cuboid concrete (there is steel bar inside) foundation top height 4.9m, width 6m, length 50m. Such as Figure 12 , Figure 13 As shown, starting from the foundation ground, a layer of high thermal conductivity HDPE plastic pipes (also used as cooling water pipes during concrete construction) is embedded every 0.7m as the embedded blast hole. The inner diameter of the plastic pipe is 32mm, and the pipes of the same layer are all on the same level Inside, the direction is perpendicular to the length direction of the foundation, and the distance between the pipes is 1m. In the vertical plane perpendicular to the length direction of the foundation, 6 parallel embedded pipes (one for each floor) are connected to form a single passage, and the two ends of the passage are opened on the facade of the foundation, and the length of a single passage is about 40m; except The ends of other pre-embedded pipes other than the two ends of the passage extend until t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

PropertyMeasurementUnit
Bottom thicknessaaaaaaaaaa
Lengthaaaaaaaaaa
Login to view more

Abstract

Disclosed are a large-area or large-volume concrete pre-buried blast hole arrangement method and a blasting demolition method. A plurality of high-heat-conductivity HDPE plastic pipes or steel pipes or cast iron pipes are pre-buried in concrete, can be used as cooling water pipes in the large-volume concrete construction process, and can also be used as blast holes for blasting demolition in the future. In the blasting demolition construction process, through the technical means of binding continuous or discontinuous cartridge bags and detonating cords through ropes for traction power charging and the like, stable explosion propagation and a good crushing effect are guaranteed. The life cycle design philosophy is applied, meanwhile, temperature control in the large-area and large-volume concrete construction process and blasting demolition in the future are considered, and revolutionary technical progress is achieved. Good economic and social benefits can be brought.

Description

technical field [0001] The invention relates to the field of blasting engineering, in particular to a large-area or large-volume concrete demolition blasting technology. Background technique [0002] In engineering construction, large-area or large-volume concrete is required in many occasions, such as concrete dams in water conservancy projects or mines, concrete shear walls in high-rise buildings, large concrete foundations, concrete retaining structures, and concrete slabs in buildings. [0003] my country's "Code for Construction of Mass Concrete" GB50496-2009 stipulates that: the concrete member whose minimum geometric size of the concrete structure entity is not less than 1m is a mass concrete; the definition of large-area concrete usually refers to a one-dimensional structure of the concrete structure entity. The dimension is less than 1m, but the other two dimensions are greater than 2m. For the blasting demolition of these large-area and large-volume concrete compon...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): F42D3/02F42D1/00
Inventor 叶建军刘应元程大春
Owner 叶建军
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products