Heat-insulation and decorative integrated wall with composite aerogel and light steel keels and method for manufacturing heat-insulation and decorative integrated wall
A technology of composite aerogel and light steel keel, which is applied in the direction of walls, building components, buildings, etc., can solve the problems such as decorative integrated walls that have not yet used aerogel material composite light steel keel, and avoid the construction site. and worker health effects, reduced breakage, reduced thickness and space
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0072] 1) Lay high-strength panels. Mix 175kg of water, 461kg of cement, 512kg of sand, and 50kg of glass fiber, pour it into the abrasive tool after mixing, level the surface, and maintain it naturally for 28 days to obtain a fiber-reinforced cement board.
[0073] 2) Lay 10mm thick silica airgel felt on the high-strength panel. The airgel felt is fixed by anchor nails.
[0074] 3) Lay light steel keel.
[0075] 4) Then lay high-strength panels.
[0076] The high-strength panel is prepared according to step 1). Secured with anchors.
[0077] 5) Make a decorative layer on the outer surface of the load-bearing concrete and reinforcement layer. Both the load-bearing concrete and the decorative layer on the outer surface of the reinforced layer are paints.
Embodiment 2
[0079] 1) Lay high-strength panels. Mix 150kg of water, 300kg of cement, 400kg of light sand, 400kg of floating beads, and 60kg of glass fiber. After mixing, pour it into the abrasive tool, level the surface, and maintain it naturally for 28 days to obtain a fiber-reinforced light aggregate cement board.
[0080] 2) Lay a 10mm-thick silica airgel sheet on the high-strength panel. A vapor barrier is laid between the airgel board and the high-strength panel. The airgel felt is fixed by anchor nails.
[0081] 3) Lay light steel keel.
[0082] 4) Then lay high-strength panels
[0083] The high-strength panel is prepared according to step 1). Secured with anchors.
[0084] 5) Make a decorative layer on the outer surface of the load-bearing concrete and reinforcement layer. The outer surface of the load-bearing concrete is decorated with fluorocarbon paint, and the outer surface of the reinforcement layer is decorated with wallpaper.
Embodiment 3
[0086] 1) Lay high-strength panels. Dissolve 65kg of aluminum sulfate in 200kg of water to prepare an aluminum sulfate solution, and dissolve 23kg of quicklime in 200kg of water to prepare lime water. Put the lime water in the container, slowly add the aluminum sulfate solution under the condition of stirring at 300r / min until the pH value is 7.2, and obtain the translucent ettringite colloid. The premixed dry material is prepared and mixed as follows: Portland cement 40kg, gypsum 360kg, fine sand 500kg, vitrified microbeads 80kg, silicon micropowder 12kg. Add 50kg of glass fiber and 1kg of waterproofing agent to the prepared ettringite colloid, and stir for 15 minutes to prepare a premixed wet material, then add the premixed dry material, and continue to stir for 18 minutes. Pour the obtained concrete slurry into the mould, and the abrasive tool has built-in steel bars with a diameter of 16mm and a spacing of 200mm. The surface is leveled and maintained for 28 days to obtain...
PUM
Property | Measurement | Unit |
---|---|---|
Compressive strength | aaaaa | aaaaa |
Thermal conductivity | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com