Large-deformation control construction method for high ground stress weak surrounding rock tunnel

A technology of weak surrounding rock and high in-situ stress, applied in tunnels, tunnel linings, underground chambers, etc., can solve problems such as waste, unreachable deformation, and inability to scientifically and accurately predict the amount of deformation reserved for excavation.

Active Publication Date: 2016-03-16
CHINA RAILWAY 20 BUREAU GRP
View PDF3 Cites 29 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0018] Third, the large amount of deformation, rapid development and continuous non-convergence, it is very common for the supporting system after construction to be intruded due to poor control of the deformation amount;
[0019] Fourth, the amount of deformation reserved for excavation cannot be scientifically and accurately predicted. If it is too large to increase the excavation section of the tunnel, it will not only be detrimental to the stability of the surrounding rock, but also cause serious waste because the deformation cannot be reached; if it is too small, if the excessive deformation invades limit, resulting in safety risks and waste of replacement

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Large-deformation control construction method for high ground stress weak surrounding rock tunnel
  • Large-deformation control construction method for high ground stress weak surrounding rock tunnel
  • Large-deformation control construction method for high ground stress weak surrounding rock tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0089] Such as figure 1 , figure 2 As shown, the large deformation control construction method of the high ground stress weak surrounding rock tunnel of the present invention is characterized in that the method includes the following steps: along the longitudinal extension direction of the tunnel, constructing the constructed weak surrounding rock tunnel in multiple segments from the back to the front The construction method of a plurality of described sections is all the same; When constructing any section in the soft surrounding rock tunnel of construction, comprise the following steps:

[0090] Step 1. Test of rock mass strength and maximum internal stress of surrounding rock: before excavation of the current construction segment, the rock mass strength Rb of the surrounding rock of the current construction segment and the maximum internal stress σ of the surrounding rock max test separately;

[0091] Step 2. Determination of the extrusion-type large deformation grade of...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a large-deformation control construction method for a high ground stress weak surrounding rock tunnel. A plurality of segments are arranged in the longitudinal extending direction of the tunnel from back to front to construct the constructed weak surrounding rock tunnel. The method comprises the steps that firstly, the rock strength and surrounding rock interior maximum ground stress test is carried out; secondly, the large extrusion deformation grade of the surrounding rock is determined; thirdly, a primary support scheme is determined; fourthly, tunnel excavation and primary support construction are carried out; fifthly, longitudinal tunnel strengthening structure construction is carried out; sixthly, tunnel secondary lining construction is carried out; seventhly, construction of the next segment is carried out according to the first step to the sixth step; and eighthly, the seventh step is repeated many times till the whole construction process of the constructed weak surrounding rock tunnel is finished. According to the method, the steps are simple, the design is reasonable, construction is convenient, and the using effect is good. The tunnel construction process of the high ground stress weak surrounding rock tunnel can be easily, conveniently and rapidly finished, the construction process is safe and reliable, and the large deformation of the weak rock can be effectively controlled.

Description

technical field [0001] The invention belongs to the technical field of tunnel construction, and in particular relates to a large deformation control construction method of a tunnel with high ground stress and weak surrounding rock. Background technique [0002] Tunnel excavation will inevitably lead to the redistribution of the original stress of the surrounding rock. The mechanical behavior of the stress redistribution of the entire surrounding rock can be generalized as the following process: balance. "Looseness" and "looseness" are two completely different concepts in describing the process of stress redistribution, and the manifestations of surrounding rock loads in these two processes are also different. The load generated in the "relaxation" stage is called "deformation pressure". At this time, the reduction of the stress level of the surrounding rock and the deformation of the surrounding rock coexist. From the perspective of rock mechanics, the surrounding rock at t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/00E21D11/14E21D11/18
CPCE21D9/00E21D11/14E21D11/18
Inventor 任少强吴应明王平安谭忠盛冀胜利谢江胜崔文镇杨文宣杨星智
Owner CHINA RAILWAY 20 BUREAU GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products