Gas well surface layer well completion liquid-solid separation construction process
A technology of solid-liquid separation and construction technology, which is applied in the direction of wellbore/well components, earthwork drilling and production, etc. It can solve the problem that the surface completion fluid cannot be discharged, and achieve the effect of solving the problem of non-discharge
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] A gas well surface layer completion fluid solid-liquid separation construction process is carried out according to the following steps:
[0023] Step 1, the underflow pipeline 4 of the centrifuge 2 on the circulation tank 1 is connected with the clear water storage tank 6 through the transition groove 5 provided on the surface of the circulation tank;
[0024] Step 2, use the electric funnel 3 to add G320 whose mass percentage is 0.25-0.4% of the completion fluid in the circulation tank 1 to the circulation tank 1 equipped with the surface completion fluid, and stir for 10-15 minutes, and the circulation tank 1 Flocculation occurs in the internal completion fluid, and clear water precipitates out;
[0025] Step 3, turn on the centrifuge 2, adjust the speed to 1600-2000r / min, the liquid in the circulation tank 1 enters the centrifuge 2 for solid-liquid separation, and the separated solid particles are discharged through the sand outlet of the centrifuge 2, separated The...
Embodiment 2
[0029] Take the gas well surface completion fluid of Su 36-J22 well, the gas well surface completion fluid ρ=1.12g / cm 3 , FV=55S, the gas well surface completion fluid obtained is injected into the circulation tank and the mixer and centrifuge on the tank surface for solid-liquid separation treatment. The gas well surface completion fluid injected into the circulation tank is 30m 3 , using an electric funnel, add 100kgG320 (0.3% by mass) to the circulation tank containing the surface completion fluid. After stirring for 12 minutes, the completion fluid in the circulation tank is obviously flocculated and clear water is precipitated; turn on the centrifuge and adjust the speed to 1900r / min, for solid-liquid separation, the sand outlet of the centrifuge is relatively dry solid particles, the bottom flow is clear water, ρ=1.01g / cm 3 , FV=27S; the bottom flow clean water is introduced into the clean water storage tank through the transition tank to complete the solid-liquid separa...
Embodiment 3
[0031] A gas well surface layer completion fluid solid-liquid separation construction process is carried out according to the following steps:
[0032] Step 1, the underflow pipeline 4 of the centrifuge 2 on the circulation tank 1 is connected with the clear water storage tank 6 through the transition groove 5 provided on the surface of the circulation tank;
[0033] Step 2, using the electric funnel 3, add G320 whose mass percentage is 0.4% of the completion fluid in the circulation tank 1 to the circulation tank 1 containing the surface layer completion fluid, stir for 10-15 minutes, and complete the well completion fluid in the circulation tank 1. The well fluid flocculates and the clear water precipitates out;
[0034] Step 3, turn on the centrifuge 2, adjust the speed to 1800r / min, the liquid in the circulation tank 1 enters the centrifuge 2 for solid-liquid separation, the separated solid particles are discharged through the sand outlet of the centrifuge 2, and the separ...